{"componentChunkName":"component---src-templates-pagina-foglia-completa-template-en-jsx","path":"/en/tsunami/activities/","result":{"data":{"node":{"title":"Tsunami risk. Activities","field_titolo_esteso":"Tsunami risk. Activities","drupal_internal__nid":900013583,"field_data":"2024-07-17T15:32:12+02:00","field_id_contenuto_originale":900013582,"field_categoria_primaria":"pagina","field_streaming_homepage":false,"field_link":null,"body":{"processed":"<p>Over the centuries, Mediterranean coasts have been affected by numerous tsunami events arising from earthquakes. In view of the exposure to this risk of the Italian coasts, on February 17, 2017, the directive of the President of the Council of Ministers establishing the National Alerting System (SiAM) for tsunamis generated by earthquakes in the Mediterranean Seas was signed, under the coordination of the Civil Protection Department.</p>\n<p>Within this system, the INGV - National Institute of Geophysics and Volcanology - operating through the Cat (Tsunami Alert Center) - has the task of assessing, in its area of competence, the possibility that an earthquake of magnitude equal to or greater than 5.5, with epicenter at sea or near the coast, may generate a tsunami and estimate the time of arrival of the wave along the different stretches of coast. The tideographic data provided by Ispra - Superior Institute for the protection and the environmental research allow to confirm or not the possibility that a tsunami will occur. On the basis of Cat evaluations, the Department of Civil Protection - through the Situation Room Italy - has the task of spreading the warning messages to activate, in the shortest possible time, the National Service of Civil Protection.</p>\n<p>In implementation of the provisions of the Directive establishing the SiAM, on November 15, 2018, the Decree of the Head of Department containing the guidelines for updating the civil protection plans for the tsunami risk was published in the Official Gazette. The main purpose of the measure is to provide the various components and operational structures of the National Service with elements related to this specific risk and useful for civil protection planning, for the protection of the population along the coasts.</p>\n<p>With regard to the SiAM, it is important to underline that, although scientifically accurate and rapid forecasting of tsunamis has accomplished significat progress in recent years, it is not always possible to issue a timely alert. Also, the assessment carried out by the Ingv Cat does not ensure the certainty that after the issuance of the alert, a tsunami will occur, and does not even ensure that the impact of a tsunami on the coast will be always preceded by the issuance of the alert message. Moreover, in the case of tsunamigenic earthquakes close to the Italian coast, the arrival of SiAM warning messages could take place in areas close to the earthquake point of origin, in insufficient time to activate preventive measures to protect the population. Therefore, it is fundamental that the citizen knows how to recognize the precursors of a tsunami event and knows the rules of self-protection. For this reason, it is important to start prevention activities, aimed at reducing the risk and disseminating knowledge of civil protection.</p>\n"},"fields":{"slug":"/tsunami/activities/"},"field_link_esterni":[{"title":"Ingv - National Institute of Geophysics and Volcanology","uri":"http://www.ingv.it/it/"},{"title":"Ingv - Tsunami Alert Centre","uri":"https://www.ingv.it/cat/it/"},{"title":"Ingv - National Earthquake Center","uri":"http://cnt.rm.ingv.it/"},{"title":"Ispra - Italian Institute for Environmental Protection and Research","uri":"http://www.isprambiente.gov.it/it"}],"field_tabella":null,"relationships":{"field_sottodominio":{"name":"Rischi"},"field_riferimento_traduzione":{"fields":{"slug":"/maremoto/attivita/"}},"field_immagine_singola":null,"field_mappa":null,"field_box_social":null,"field_accordion":[{"field_titolo":"Level and alert zone","field_tabella":null,"field_testo":{"processed":"<p>With regard to SiAM, <strong>two alert levels </strong>are adopted. They are based on the estimated severity of the tsunami on the Italian coasts. These levels, as well as the estimated arrival time of the first tsunami wave on the coast are estimated at forecast points corresponding to specific geographical coordinates (located along the coast). In analogy to the alert levels adopted throughout the Mediterranean, the alert levels are:</p>\n<ul><li><strong>Orange (Advisory):</strong> indicates that the Italian coasts could be affected by a tsunami wave with a height of less than 0.5 meters and/or with a run up of less than 1 meter;</li>\n<li><strong>Red (Watch):</strong> indicates that the Italian coasts could be affected by a tsunami wave with a height of more than 0.5 meters and/or with a run up of more than 1 meter.</li>\n</ul><p> \"run up\" means the maximum topographic altitude reached by the tsunami wave during its flooding with respect to the average sea level.</p>\n<p>The coastal areas to evacuate in case of Orange or Red alert are specified in the flood maps issued by Ispra. Here, the Orange alert level is associated with the \"<strong>alert zone 1</strong>\" while the Red alert level is associated with the \"<strong>alert zone 2</strong>\". According to the broadness of the alert zones, their vulnerability, and the characteristics of the clearance routes and the operational capabilities of the territorial system, municipalities may consider whether to maintain two separate alert zones, or alternatively, to merge them into a single zone (\"single zone - red/orange alert\"). These maps can be consulted at the link <a href=\"http://sgi2.isprambiente.it/tsunamimap/\">http://sgi2.isprambiente.it/tsunamimap/ </a>where, currently, only those relating to the alert zones for the Regions of Calabria and Sicily are available.</p>\n<p><strong>Maps elaborated by Ispra</strong>, even preliminary, have been realized according to a methodology used and acknowledged at the international level. They are based on a recent model of hazard probability for tsunamis generated by earthquakes (S-PTHA, Seismic - PTHA), produced within the project TSUMAPS-NEAM, co-financed by DGECHO and coordinated by INGV. Further details are available in Allegato 1 alle Indicazioni operative(2191 Kb).  At the moment, they represent the most accurate available information on the basis of the data accessible at national level. As such, they can be further refined according to the data quality and resolution of the cartographic charts and the evolution of the processing methodologies..</p>\n","value":"<p>With regard to SiAM, <strong>two alert levels </strong>are adopted. They are based on the estimated severity of the tsunami on the Italian coasts. These levels, as well as the estimated arrival time of the first tsunami&nbsp;wave on the coast are estimated at forecast points corresponding to specific geographical coordinates (located along the coast). In analogy to the alert levels adopted throughout the Mediterranean, the alert levels are:</p>\r\n\r\n<ul>\r\n\t<li><strong>Orange (Advisory):</strong> indicates that the Italian coasts could be affected by a tsunami wave with a height of less than 0.5 meters and/or with a run up of less than 1 meter;</li>\r\n\t<li><strong>Red (Watch):</strong> indicates that the Italian coasts could be affected by a tsunami wave with a height of more than 0.5 meters and/or with a run up of more than 1 meter.</li>\r\n</ul>\r\n\r\n<p>&nbsp;\"run up\" means the maximum topographic altitude reached by the tsunami wave during its flooding with respect to the average sea level.</p>\r\n\r\n<p>The coastal areas to evacuate in case of Orange or Red alert are specified in the flood maps issued by Ispra. Here, the Orange alert level is associated with the \"<strong>alert zone 1</strong>\" while the Red alert level is associated with the \"<strong>alert zone 2</strong>\". According to the broadness of the alert zones, their vulnerability, and the characteristics of the clearance routes and the operational capabilities of the territorial system, municipalities may consider whether to maintain two separate alert zones, or alternatively, to merge them into a single zone (\"single zone - red/orange alert\"). These maps can be consulted at the link&nbsp;<a href=\"http://sgi2.isprambiente.it/tsunamimap/\">http://sgi2.isprambiente.it/tsunamimap/ </a>where, currently, only those relating to the alert zones for the Regions of Calabria and Sicily are available.</p>\r\n\r\n<p><strong>Maps elaborated by Ispra</strong>, even preliminary, have been realized according to a methodology used and acknowledged at the international level. They are based on a recent model of hazard probability for tsunamis generated by earthquakes (S-PTHA, Seismic - PTHA), produced within the project TSUMAPS-NEAM, co-financed by DGECHO and coordinated by INGV. Further details are available in&nbsp;Allegato 1 alle Indicazioni operative(2191 Kb). &nbsp;At the moment, they represent the most accurate available information on the basis of the data accessible at national level. As such, they can be further refined according to the data quality and resolution of the cartographic charts and the evolution of the processing methodologies..</p>\r\n"},"relationships":{"field_immagine":null,"field_video":null,"field_link_interni":[]},"drupal_internal__id":21929},{"field_titolo":"Alert messages","field_tabella":null,"field_testo":{"processed":"<p>The SiAM tsunami <strong>warning messages </strong>are issued when the INGV Cat records a seismic event, which can have significant impact on the italian coasts. The alert message may be associated with two alert levels: <strong>red </strong>or <strong>orange</strong>.</p>\n<p>Alert messages can be followed by messages of:</p>\n<ul><li><strong>update</strong>, when, on the basis of new data acquisitions or re-elaborations of an event, some changes occur in the estimation of seismic parameters that can determine an increase in the alert level with respect to those already issued;</li>\n<li><strong>revocation</strong>, when the recorded seismic event does not give rise to the tsunami event or causes a very low magnitude tsunami. This message invalidates the previous alert message;</li>\n<li><strong>confirmation</strong>, when the analysis of sea level data records the instrumental confirmation of tsunami waves. This message is issued following an alert or alert update;</li>\n<li><strong>end of an event</strong>, is issued at the conclusion of the tsunami, when the changes in sea level observed on the marigraph are comparable with the levels recorded before the tsunami. This message concludes all early warning messages issued in relation to the same event.</li>\n</ul><p>Within SiAM, it is also issued a message of:</p>\n<ul><li><strong>information</strong>, which is not an alert but indicates that it is unlikely that the tsunami wave would have significant impact on the Italian coasts, nevertheless, within 100 km from the earthquake's epicentre, variations in currents and anomalous wave movements can be generated.</li>\n</ul>","value":"<p>The SiAM tsunami <strong>warning messages </strong>are issued when the INGV Cat records a seismic event, which can have significant impact on the italian coasts. The alert message may be associated with two alert levels: <strong>red </strong>or <strong>orange</strong>.</p>\r\n\r\n<p>Alert messages can be followed by messages of:</p>\r\n\r\n<ul>\r\n\t<li><strong>update</strong>, when, on the basis of new data acquisitions or re-elaborations of an event, some changes occur in the estimation of seismic parameters that can determine an increase in the alert level with respect to those already issued;</li>\r\n\t<li><strong>revocation</strong>, when the recorded seismic event does not give rise to the tsunami event or causes a very low magnitude tsunami. This message invalidates the previous alert message;</li>\r\n\t<li><strong>confirmation</strong>, when the analysis of sea level data records the instrumental confirmation of tsunami waves. This message is issued following an alert or alert update;</li>\r\n\t<li><strong>end of an event</strong>, is issued at the conclusion of the tsunami, when the changes in sea level observed on the marigraph are comparable with the levels recorded before the tsunami. This message concludes all early warning messages issued in relation to the same event.</li>\r\n</ul>\r\n\r\n<p>Within SiAM, it is also issued a message of:</p>\r\n\r\n<ul>\r\n\t<li><strong>information</strong>, which is not an alert but indicates that it is unlikely that the tsunami wave would have significant impact on the Italian coasts, nevertheless, within 100 km from the earthquake's epicentre, variations in currents and anomalous wave movements can be generated.</li>\r\n</ul>\r\n"},"relationships":{"field_immagine":null,"field_video":null,"field_link_interni":[]},"drupal_internal__id":21930},{"field_titolo":"Messages","field_tabella":null,"field_testo":{"processed":"<p>Alerts distribution, must necessarily take place in a short time, thus the Civil Protection Department - which operates within the SiAM - cannot rely on the procedure normally used for other civil protection risks, in which alerts are spread through the Regions and/or Prefectures.</p>\n<p>In this context, the Department has developed the SiAM Technology Platform, capable of simultaneously dispatching alert messages to a different group of parties - including Components, Operating Structures and Service Providers - identified in Annex 2 of the SiAM Directive and subsequently integrated into Annex 2 of Operating indications (154 Kb).  It should be noted that the Platform does not directly reach the population, which should be alerted through the procedures defined in the municipal civil protection plan together with the plans of the other territorial levels.</p>\n<p>The Platform has been developed to automatically receive the warning messages from the INGV CAT, which contain the indication of potentially tsunamigenic seismic events. Once verified the formal validity of the messages, the Platform will start the transmission to all the addresses in its registry, following a dual distribution channel that provides for the sending of SMS and email. Moreover, the use of IVR - Interactive Voice Response - is under development.</p>\n","value":"<p>Alerts distribution, must necessarily take place in a short time, thus the Civil Protection Department - which operates within the SiAM - cannot rely on the procedure normally used for other civil protection risks, in which alerts are spread through the Regions and/or Prefectures.</p>\r\n\r\n<p>In this context, the Department has developed the SiAM Technology Platform, capable of simultaneously dispatching alert messages to a different group of parties - including Components, Operating Structures and Service Providers - identified in Annex 2 of the SiAM Directive and subsequently integrated into&nbsp;Annex 2 of Operating indications&nbsp;(154 Kb). &nbsp;It should be noted that the Platform does not directly reach the population, which should be alerted through the procedures defined in the municipal civil protection plan together with the plans of the other territorial levels.</p>\r\n\r\n<p>The Platform has been developed to automatically receive the warning messages from the INGV CAT, which contain the indication of potentially tsunamigenic seismic events. Once verified the formal validity of the messages, the Platform will start the transmission to all the addresses in its registry, following a dual distribution channel that provides for the sending of SMS and email. Moreover, the use of IVR - Interactive Voice Response - is under development.</p>\r\n"},"relationships":{"field_immagine":null,"field_video":null,"field_link_interni":[]},"drupal_internal__id":21931},{"field_titolo":"Intervention strategy","field_tabella":null,"field_testo":{"processed":"<p>The general strategy adopted in the Operational guidelines for the protection of the population in the event of a tsunami is the preventive evacuation of the population in risk coastal areas. It can be done either vertically, when the highest floors of the buildings or higher topographical heights of the coast are reached ( see Annex 3 to operative indication - 53 Kb) or horizontally, when people move away from the coast at risk towards the hinterland. The strategy translates into activities and safeguard measures, which are further explained in the Operating Instructions.</p>\n<p>Particularly:</p>\n<p><strong>In the case of a red or orange warning message</strong>, the only operational phase that can be activated is the Alarm phase, since the tsunami originates from an unpredictable event and its ignition takes place in a limited span of time that precludes the activation of previous operational phases. During the Alert operational phase, operators will intervene to facilitate the evacuation of the population and the securing of the infrastructures on the territory. Thus, during this stage, the coastal municipalities must implement their emergency plans and activate the procedures to alert the population; regions have to implement the procedures for managing the flow of information with the coastal municipalities involved in the alert; the operational structures, regions, provinces and prefectures-UTG must implement the necessary actions to support municipalities, as far as they can, activating - if required - their sector plans. In this phase, the Department of Civil Protection evaluates the possible convocation of the Operational Committee and with INGV and ISPRA, follows the evolution of the alert providing updates. The Department is also responsible for providing information to the press.</p>\n<p><strong>Updating and Confirmation messages</strong>, containing information on alert levels, are also associated with the Operational Alarm Phase.</p>\n<p><strong>When an information message is issued</strong>, the main measures involve the territorial level - such as municipal administrations and operational structures - and consist in information activities addressed to the population, aimed at providing information about the ongoing event and monitoring the effective use of resources available. At national level, SiAM activities consist in monitoring the evolution of the event; particularly, the Department maintains a close link with operational structures and coastal regions to monitor any critical local situations and also provides information to the press.</p>\n<p><strong>In the event that a tsunami occurs</strong>, affecting partially or totally the coastline alerted, even before receiving <strong>End of Event message</strong>, the operational actions related to the emergency management provided in the territorial plans must be implemented. The operational response should be based on the consequences occurred on the territory, ranging from the municipal level activation, up to the activation, if necessary, of the entire National Service of Civil Protection. In relation to the current situation and on the basis of operational needs, it may be necessary to convey the Operational Committee by the Civil Protection Department - unless already activated during the Alarm phase - or the establishment of a Di.Coma.C., to ensure the coordination of on-site emergency management.</p>\n<p>Finally, in the case of a <strong>Revocation message</strong>, which is always preceded by an Alarm message, even though a tsunami did not occurred, it may be necessary to manage the activities to return to normal situation. Furthermore, information regarding the message issued and information regarding the modalities for returning to the conditions in place before the alert should be sent to the population.</p>\n","value":"<p>The general strategy adopted in the Operational guidelines for the protection of the population in the event of a tsunami is the preventive evacuation of the population in risk coastal areas. It can be done either vertically, when the highest floors of the buildings or higher topographical heights of the coast are reached ( see&nbsp;Annex 3 to operative indication&nbsp;- 53 Kb)&nbsp;or horizontally, when people move away from the coast at risk towards the hinterland. The strategy translates into activities and safeguard measures, which are further explained in the Operating Instructions.</p>\r\n\r\n<p>Particularly:<br />\r\n<br />\r\n<strong>In the case of a red or orange warning message</strong>, the only operational phase that can be activated is the Alarm phase, since the tsunami originates from an unpredictable event and its ignition takes place in a limited span of time that precludes the activation of previous operational phases. During the Alert operational phase, operators will intervene to facilitate the evacuation of the population and the securing of the infrastructures on the territory. Thus, during this stage, the coastal municipalities must implement their emergency plans and activate the procedures to alert the population; regions have to implement the procedures for managing the flow of information with the coastal municipalities involved in the alert; the operational structures, regions, provinces and prefectures-UTG must implement the necessary actions to support municipalities, as far as they can, activating - if required - their sector plans. In this phase, the Department of Civil Protection evaluates the possible convocation of the Operational Committee and with INGV and ISPRA, follows the evolution of the alert providing updates. The Department is also responsible for providing information to the press.</p>\r\n\r\n<p><strong>Updating and Confirmation messages</strong>, containing information on alert levels, are also associated with the Operational Alarm Phase.<br />\r\n<br />\r\n<strong>When an information message is issued</strong>, the main measures involve the territorial level - such as municipal administrations and operational structures - and consist in information activities addressed to the population, aimed at providing information about the ongoing event and monitoring the effective use of resources available. At national level, SiAM activities consist in monitoring the evolution of the event; particularly, the Department maintains a close link with operational structures and coastal regions to monitor any critical local situations and also provides information to the press.<br />\r\n<br />\r\n<strong>In the event that a tsunami occurs</strong>, affecting partially or totally the coastline alerted, even before receiving <strong>End of Event message</strong>, the operational actions related to the emergency management provided in the territorial plans must be implemented. The operational response should be based on the consequences occurred on the territory, ranging from the municipal level activation, up to the activation, if necessary, of the entire National Service of Civil Protection. In relation to the current situation and on the basis of operational needs, it may be necessary to convey the Operational Committee by the Civil Protection Department - unless already activated during the Alarm phase - or the establishment of a Di.Coma.C., to ensure the coordination of on-site emergency management.</p>\r\n\r\n<p>Finally, in the case of a <strong>Revocation message</strong>, which is always preceded by an Alarm message, even though a tsunami did not occurred, it may be necessary to manage the activities to return to normal situation. Furthermore, information regarding the message issued and information regarding the modalities for returning to the conditions in place before the alert should be sent to the population.</p>\r\n"},"relationships":{"field_immagine":null,"field_video":null,"field_link_interni":[]},"drupal_internal__id":21932},{"field_titolo":"Emergency pianifications","field_tabella":null,"field_testo":{"processed":"<p>In implementation of the Directive establishing the SiAM, the Department's operational guidelines are intended to provide the territorial levels (Regions, Provinces, Municipalities), operational structures and managers of essential services and mobility useful elements for the elaboration or updating of their civil protection plans.</p>\n<p>The indications provide that the territorial level plans must be articulated according to the different SiAM messages. Also, the various levels should decline the information received from the national level in specific procedures able to respond to the specific needs of the territory. With regard to the action plans for managing the emergency, these should match those for seismic risk, but tailored to a different type of risk. Particularly for tsunami risk, it is necessary to verify that the headquarters of the coordination centres and the emergency areas are not located in areas within warning zones 1 or 2.</p>\n<p>Regional and provincial plans must guarantee the necessary support to the activities of coastal municipalities in the phases of planning, population alerting and emergency management, and provide for specific activities in accordance with their institutional roles. Regions, for instance, should promote exercises, studies and insights (in terms of danger, vulnerability of the building and removal routes, evacuation methods, etc..) taking into account both the exposure to risk and the available resources. The Prefectures have to define the modalities of public order management in order to facilitate the \"supervised\" evacuation.</p>\n<p><strong>The most significant part of the operational guidelines </strong>on civil protection planning is addressed to municipalities. Particularly, the document envisages the organization of the municipal plans in four main sections, containing indications on the dangerousness of the coasts and alert  zones, the procedures to alert the population; the model of intervention and the main activities and information and communication activities. Moreover, in the description of the intervention model, it is recommended to municipalities to identify in their Civil Protection Plan the methods for keeping the population away from the coast at risk to guarantee an effective distancing of the population. It is also suggested to evaluate the possibility of preparing an<strong> emergency signal</strong>, for which a model is provided in Annex 4 to the Operational Indications (2578 Kb).</p>\n<p>On the basis of the general strategy outlined in the Operational Guidelines, the operational components and structures receiving the alert messages must prepare the plans to integrate their intervention in the field of civil protection, activating national and territorial levels in compliance with the internal organization and their command and control network. These domestic plans should be organized so as to provide safeguard of instrumental and human resources  in risk areas. The Maritime Authority and the Prefectures - UTG together with the State Forces present on the territory should elaborate a specific sector planning.</p>\n","value":"<p>In implementation of the Directive establishing the SiAM, the Department's operational guidelines are intended to provide the territorial levels (Regions, Provinces, Municipalities), operational structures and managers of essential services and mobility useful elements for the elaboration or updating of their civil protection plans.</p>\r\n\r\n<p>The indications provide that the territorial level plans must be articulated according to the different SiAM messages. Also, the various levels should decline the information received from the national level in specific procedures able to respond to the specific needs of the territory. With regard to the action plans for managing the emergency, these should match those for seismic risk, but tailored to a different type of risk. Particularly for tsunami risk, it is necessary to verify that the headquarters of the coordination centres and the emergency areas are not located in areas within warning zones 1 or 2.</p>\r\n\r\n<p>Regional and provincial plans must guarantee the necessary support to the activities of coastal municipalities in the phases of planning, population alerting and emergency management, and provide for specific activities in accordance with their institutional roles. Regions, for instance, should promote exercises, studies and insights (in terms of danger, vulnerability of the building and removal routes, evacuation methods, etc..) taking into account both the exposure to risk and the available resources. The Prefectures have to define the modalities of public order management in order to facilitate the \"supervised\" evacuation.</p>\r\n\r\n<p><strong>The most significant part of the operational guidelines </strong>on civil protection planning is addressed to municipalities. Particularly, the document envisages the organization of the municipal plans in four main sections, containing indications on the dangerousness of the coasts and alert &nbsp;zones, the procedures to alert the population; the model of intervention and the main activities and information and communication activities. Moreover, in the description of the intervention model, it is recommended to municipalities to identify in their Civil Protection Plan the methods for keeping the population away from the coast at risk to guarantee an effective distancing of the population. It is also suggested to evaluate the possibility of preparing an<strong> emergency signal</strong>, for which a model is provided in Annex 4 to the Operational Indications&nbsp;(2578 Kb).</p>\r\n\r\n<p>On the basis of the general strategy outlined in the Operational Guidelines, the operational components and structures receiving the alert messages must prepare the plans to integrate their intervention in the field of civil protection, activating national and territorial levels in compliance with the internal organization and their command and control network. These domestic plans should be organized so as to provide safeguard of instrumental and human resources&nbsp; in risk areas. The Maritime Authority and the Prefectures - UTG together with the State Forces present on the territory should elaborate a specific sector planning.</p>\r\n"},"relationships":{"field_immagine":null,"field_video":null,"field_link_interni":[]},"drupal_internal__id":21933}],"field_tab":[],"field_immagine_dettaglio":{"field_alt":"Attività Rischio Maremoto","field_didascalia":"Attività Rischio Maremoto","relationships":{"image":{"localFile":{"publicURL":"/static/3bf20fb71c2f7cfc39f03dcae4e351d6/marem-att-eng.jpg","childImageSharp":{"fluid":{"aspectRatio":1.5027322404371584,"src":"/static/3bf20fb71c2f7cfc39f03dcae4e351d6/7bc87/marem-att-eng.jpg","srcSet":"/static/3bf20fb71c2f7cfc39f03dcae4e351d6/cf463/marem-att-eng.jpg 275w,\n/static/3bf20fb71c2f7cfc39f03dcae4e351d6/7bc87/marem-att-eng.jpg 376w","sizes":"(max-width: 376px) 100vw, 376px"}}}}}},"field_immagine_anteprima":null,"field_galleria_flickr":null,"field_galleria_foto":null,"field_video_content":null,"field_allegati":[{"title":"Allegato 1 – Metodologia utilizzata per la definizione delle zone di allertamento","field_titolo_esteso":"Allegato 1 – Metodologia utilizzata per la definizione delle zone di allertamento","relationships":{"field_allegato":{"filesize":2191149,"localFile":{"publicURL":"/static/ad979b18c9e104b6d3aea330a6cf1b4f/allegato-1-alle-indicazioni-operative.pdf","extension":"pdf"},"filename":"allegato-1-alle-indicazioni-operative.pdf"}}},{"title":"Allegato 2 – Soggetti destinatari della messaggistica del SiAM e schema dei messaggi","field_titolo_esteso":"Allegato 2 – Soggetti destinatari della messaggistica del SiAM e schema dei messaggi","relationships":{"field_allegato":{"filesize":154959,"localFile":{"publicURL":"/static/5e474241a2676ff2c82c41ae6cea59d6/allegato-2-alle-indicazioni-operative.pdf","extension":"pdf"},"filename":"allegato-2-alle-indicazioni-operative.pdf"}}},{"title":"Allegato 3 – Condizioni tecniche per l’allontanamento verticale ","field_titolo_esteso":"Allegato 3 – Condizioni tecniche per l’allontanamento verticale ","relationships":{"field_allegato":{"filesize":53609,"localFile":{"publicURL":"/static/b0fcd9cc97d53a85fa3ee41ebd0bf412/allegato-3-alle-indicazioni-operative.pdf","extension":"pdf"},"filename":"allegato-3-alle-indicazioni-operative.pdf"}}},{"title":"Allegato 4 – Segnaletica di emergenza per il rischio Maremoto","field_titolo_esteso":"Allegato 4 – Segnaletica di emergenza per il rischio Maremoto","relationships":{"field_allegato":{"filesize":2578737,"localFile":{"publicURL":"/static/e775a3f0fb570b8b2bf4a73a61d8de60/allegato-4-alle-indicazioni-operative.pdf","extension":"pdf"},"filename":"allegato-4-alle-indicazioni-operative.pdf"}}},{"title":"Indicazioni per l'aggiornamento delle pianificazioni di protezione civile per il rischio maremoto","field_titolo_esteso":"Indicazioni per l'aggiornamento delle pianificazioni di protezione civile per il rischio maremoto","relationships":{"field_allegato":{"filesize":306657,"localFile":{"publicURL":"/static/0d78a388122669d46d9a7df0a09cc562/indicazioni-siam-senza-allegati.pdf","extension":"pdf"},"filename":"indicazioni-siam-senza-allegati.pdf"}}}],"field_correlazioni":[{"__typename":"node__approfondimento","title":"Tsunami Warning System. Il modello dell'Oceano Pacifico","field_titolo_esteso":"Tsunami Warning System. Il modello dell'Oceano Pacifico","body":{"processed":"<p>Nell'isola di O’ahu, alle Hawaii, dal 1948 è operativo il <em>Ptws - Pacific Tsunami Warning System</em>, un sistema di allertamento in caso di tsunami, costituito da una rete di 26 Stati del Pacifico in cui operano 30 stazioni tidali, ovvero stazioni che misurano l’altezza delle maree.</p>\n<p>Il <em>Ptws </em>può usufruire del supporto di un altro centinaio di stazioni gestite dal <em>Noaa - National Oceanic and Atmospheric Administration</em> ed è in grado di ricevere dati da centinaia di stazioni sismiche in tutto il mando, attraverso il <em>Neic - National Earthquake Information Center </em>del Colorado. Il <em>Ptws </em>coordina inoltre le attività dei centri di allertamento tsunami di Alaska, Polinesia, Cile, Giappone e Russia.</p>\n<p>Il sistema è in grado di calcolare il tempo di arrivo della prima onda di tsunami attraverso un modello che calcola la velocità delle onde, tenendo conto della profondità del bacino. Quando in un’area dell’Oceano Pacifico si genera un terremoto con magnitudo uguale o superiore a 7 della scala Richter, in meno di mezz’ora il <em>Ptws </em>è in grado di identificare l’esatta localizzazione dell’epicentro e la magnitudo del terremoto. Parte così l’allerta tsunami per tutte quelle aree che potrebbero essere colpite in meno di tre ore. Poiché il tempo necessario per avere conferma dello tsunami è più lungo di quello che serve a mette in atto le procedure di evacuazione, quest’ultime vengono immediatamente avviate.</p>\n<p>Di solito la prima indicazione di un’onda di tsunami arriva dalla stazione tidale più vicina al luogo in cui le onde di marea appaiono più grandi e più rapide rispetto a quelle registrate normalmente. Tuttavia, il segnale di una singola stazione non è sufficiente: se l’anomalia non viene confermata dal <em>Ptws </em>attraverso la registrazione di altri segnali anomali, l’allertamento e l’avviso vengono annullati. Se invece lo tsunami viene confermato, si passa immediatamente dalla fase di attenzione a quella di allertamento e poi a quella di allarme, secondo questa procedura:</p>\n<p>• Tre ore prima dell’arrivo della prima onda le sirene lanciano il segnale di allerta. La popolazione sa che deve accendere la radio e seguire l’evoluzione del fenomeno attraverso le notizie e le indicazioni diffuse da tutte le stazioni.</p>\n<p>• Le sirene suonano di nuovo due ore prima dell’arrivo previsto, e poi ancora un’ora prima e mezz’ora prima. Questi segnali sono sempre accompagnati dalle informazioni diffuse dalle radio.</p>\n<p>In caso di necessità è il personale della Protezione Civile che coordina le operazioni di evacuazione della popolazione, partendo dalle aree di costa più bassa che possono essere colpite per prime.</p>\n<p>Il sistema di allertamento del Pacifico per la difesa dagli tsunami, oltre alla capacità della comunità scientifica di prevedere il possibile arrivo di un’onda, si fonda anche sulla consapevolezza del rischio da parte della popolazione e sulla conoscenza delle norme di comportamento da adottare in caso di emergenza. Accanto ad una serie di misure di prevenzione di tipo strutturale adottate sulle isole Hawaiane – ad esempio, edifici abitati dal primo piano in su e piano terra dedicato a parcheggi aperti - la strategia scelta dal Governo prevede la diffusione capillare di informazioni sul rischio e sui piani di emergenza, sia tra i residenti che tra i turisti.</p>\n<p><em>Fonte immagine: sito dell'Ioc - Intergovernamental Coordination Group for the Pacific Tsunami Warning System (ICG/PTWS)</em></p>\n","value":"<p>Nell'isola di O’ahu, alle Hawaii, dal 1948 è operativo il <em>Ptws - Pacific Tsunami Warning System</em>, un sistema di allertamento in caso di tsunami, costituito da una rete di 26 Stati del Pacifico in cui operano 30 stazioni tidali, ovvero stazioni che misurano l’altezza delle maree.<br />\r\n<br />\r\nIl <em>Ptws </em>può usufruire del supporto di un altro centinaio di stazioni gestite dal <em>Noaa - National Oceanic and Atmospheric Administration</em> ed è in grado di ricevere dati da centinaia di stazioni sismiche in tutto il mando, attraverso il <em>Neic - National Earthquake Information Center </em>del Colorado. Il <em>Ptws </em>coordina inoltre le attività dei centri di allertamento tsunami di Alaska, Polinesia, Cile, Giappone e Russia.<br />\r\n<br />\r\nIl sistema è in grado di calcolare il tempo di arrivo della prima onda di tsunami attraverso un modello che calcola la velocità delle onde, tenendo conto della profondità del bacino. Quando in un’area dell’Oceano Pacifico si genera un terremoto con magnitudo uguale o superiore a 7 della scala Richter, in meno di mezz’ora il <em>Ptws </em>è in grado di identificare l’esatta localizzazione dell’epicentro e la magnitudo del terremoto. Parte così l’allerta tsunami per tutte quelle aree che potrebbero essere colpite in meno di tre ore. Poiché il tempo necessario per avere conferma dello tsunami è più lungo di quello che serve a mette in atto le procedure di evacuazione, quest’ultime vengono immediatamente avviate.<br />\r\n<br />\r\nDi solito la prima indicazione di un’onda di tsunami arriva dalla stazione tidale più vicina al luogo in cui le onde di marea appaiono più grandi e più rapide rispetto a quelle registrate normalmente. Tuttavia, il segnale di una singola stazione non è sufficiente: se l’anomalia non viene confermata dal <em>Ptws </em>attraverso la registrazione di altri segnali anomali, l’allertamento e l’avviso vengono annullati. Se invece lo tsunami viene confermato, si passa immediatamente dalla fase di attenzione a quella di allertamento e poi a quella di allarme, secondo questa procedura:</p>\r\n\r\n<p>• Tre ore prima dell’arrivo della prima onda le sirene lanciano il segnale di allerta. La popolazione sa che deve accendere la radio e seguire l’evoluzione del fenomeno attraverso le notizie e le indicazioni diffuse da tutte le stazioni.</p>\r\n\r\n<p>• Le sirene suonano di nuovo due ore prima dell’arrivo previsto, e poi ancora un’ora prima e mezz’ora prima. Questi segnali sono sempre accompagnati dalle informazioni diffuse dalle radio.</p>\r\n\r\n<p>In caso di necessità è il personale della Protezione Civile che coordina le operazioni di evacuazione della popolazione, partendo dalle aree di costa più bassa che possono essere colpite per prime.<br />\r\n<br />\r\nIl sistema di allertamento del Pacifico per la difesa dagli tsunami, oltre alla capacità della comunità scientifica di prevedere il possibile arrivo di un’onda, si fonda anche sulla consapevolezza del rischio da parte della popolazione e sulla conoscenza delle norme di comportamento da adottare in caso di emergenza. Accanto ad una serie di misure di prevenzione di tipo strutturale adottate sulle isole Hawaiane – ad esempio, edifici abitati dal primo piano in su e piano terra dedicato a parcheggi aperti - la strategia scelta dal Governo prevede la diffusione capillare di informazioni sul rischio e sui piani di emergenza, sia tra i residenti che tra i turisti.</p>\r\n\r\n<p><em>Fonte immagine: sito dell'Ioc - Intergovernamental Coordination Group for the Pacific Tsunami Warning System (ICG/PTWS)</em></p>\r\n"},"field_abstract":null,"field_data":"2016-07-31T15:32:00+02:00","field_categoria_primaria":"approfondimento","field_codice_lingua":false,"fields":{"slug":"/approfondimento/tsunami-warning-system--il-modello-dell-oceano-pacifico/"},"relationships":{"field_sottodominio":{"name":"Portale"},"field_immagine_anteprima":null,"field_immagine_dettaglio":null}}],"field_normative":[]}}},"pageContext":{"slug":"/tsunami/activities/","lang":"en","menu":[{"node":{"name":"Administration payments","weight":14,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/administration-payments/"},"drupal_internal__nid":796389},"parent":[{"name":"Transparent administration","drupal_internal__tid":1499}]},"drupal_internal__tid":1576}},{"node":{"name":"Department","weight":135,"relationships":{"field_link_menu":null,"parent":[]},"drupal_internal__tid":1474}},{"node":{"name":"Contact Center","weight":6,"relationships":{"field_link_menu":{"fields":{"slug":"/department/contact-center/"},"drupal_internal__nid":300001715},"parent":[{"name":"Department","drupal_internal__tid":1474}]},"drupal_internal__tid":1602}},{"node":{"name":"Extraordinary and emergency interventions","weight":15,"relationships":{"field_link_menu":null,"parent":[{"name":"Transparent administration","drupal_internal__tid":1499}]},"drupal_internal__tid":1580}},{"node":{"name":"Total amount of debts","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/administration-payments/total-amount-debts/"},"drupal_internal__nid":900013313},"parent":[{"name":"Administration payments","drupal_internal__tid":1576}]},"drupal_internal__tid":2379}},{"node":{"name":"Informative on personal data processing","weight":5,"relationships":{"field_link_menu":{"fields":{"slug":"/department/contact-center/informative-personal-data-processing/"},"drupal_internal__nid":300002119},"parent":[{"name":"Contact Center","drupal_internal__tid":1602}]},"drupal_internal__tid":1606}},{"node":{"name":"Media and Communication","weight":136,"relationships":{"field_link_menu":null,"parent":[]},"drupal_internal__tid":1608}},{"node":{"name":"Minister","weight":134,"relationships":{"field_link_menu":{"fields":{"slug":"/minister/"},"drupal_internal__nid":900006702},"parent":[]},"drupal_internal__tid":2146}},{"node":{"name":"Other contents","weight":16,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/other-contents/"},"drupal_internal__nid":737805},"parent":[{"name":"Transparent administration","drupal_internal__tid":1499}]},"drupal_internal__tid":1597}},{"node":{"name":"Q&A","weight":4,"relationships":{"field_link_menu":{"fields":{"slug":"/department/contact-center/qa/"},"drupal_internal__nid":900013597},"parent":[{"name":"Contact Center","drupal_internal__tid":1602}]},"drupal_internal__tid":2396}},{"node":{"name":"Thematic areas","weight":144,"relationships":{"field_link_menu":null,"parent":[]},"drupal_internal__tid":1617}},{"node":{"name":"Emergency Coordination Office","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/department/structure/emergency-coordination-office/"},"drupal_internal__nid":796349},"parent":[{"name":"Structure","drupal_internal__tid":1475}]},"drupal_internal__tid":1478}},{"node":{"name":"Homepage","weight":0,"relationships":{"field_link_menu":null,"parent":[]},"drupal_internal__tid":1470}},{"node":{"name":"Legal Office","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/department/structure/legal-office/"},"drupal_internal__nid":796188},"parent":[{"name":"Structure","drupal_internal__tid":1475}]},"drupal_internal__tid":1931}},{"node":{"name":"Office I - Volunteering and National Resources","weight":4,"relationships":{"field_link_menu":{"fields":{"slug":"/department/structure/office-i-volunteering-and-national-resources/"},"drupal_internal__nid":300002401},"parent":[{"name":"Structure","drupal_internal__tid":1475}]},"drupal_internal__tid":1479}},{"node":{"name":"Office II - Technical-Scientific, Forecast and Risk Prevention Activities","weight":5,"relationships":{"field_link_menu":{"fields":{"slug":"/department/structure/office-ii-technical-scientific-forecast-and-risk-prevention-activities/"},"drupal_internal__nid":795130},"parent":[{"name":"Structure","drupal_internal__tid":1475}]},"drupal_internal__tid":1480}},{"node":{"name":"Office III - Emergency Infrastructures Planning","weight":6,"relationships":{"field_link_menu":{"fields":{"slug":"/department/structure/office-iii-emergency-infrastructures-planning/"},"drupal_internal__nid":795657},"parent":[{"name":"Structure","drupal_internal__tid":1475}]},"drupal_internal__tid":1481}},{"node":{"name":"Office IV -  Emergency Recovery","weight":7,"relationships":{"field_link_menu":{"fields":{"slug":"/department/structure/office-iv-emergency-recovery/"},"drupal_internal__nid":795798},"parent":[{"name":"Structure","drupal_internal__tid":1475}]},"drupal_internal__tid":1482}},{"node":{"name":"Office V - Human and Instrumental Resources and General Services","weight":8,"relationships":{"field_link_menu":{"fields":{"slug":"/department/structure/office-v-human-and-instrumental-resources-and-general-services/"},"drupal_internal__nid":795844},"parent":[{"name":"Structure","drupal_internal__tid":1475}]},"drupal_internal__tid":1483}},{"node":{"name":"Office VI - Administration and Budget","weight":9,"relationships":{"field_link_menu":{"fields":{"slug":"/department/structure/office-vi-administration-and-budget/"},"drupal_internal__nid":100837793},"parent":[{"name":"Structure","drupal_internal__tid":1475}]},"drupal_internal__tid":1484}},{"node":{"name":"Structure","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/department/structure/"},"drupal_internal__nid":300001707},"parent":[{"name":"Department","drupal_internal__tid":1474}]},"drupal_internal__tid":1475}},{"node":{"name":"404","weight":0,"relationships":{"field_link_menu":null,"parent":[{"name":"Homepage","drupal_internal__tid":1470}]},"drupal_internal__tid":1471}},{"node":{"name":"Absence rates","weight":7,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/personnel/absence-rates/"},"drupal_internal__nid":738046},"parent":[{"name":"Personnel","drupal_internal__tid":1517}]},"drupal_internal__tid":1525}},{"node":{"name":"Accessibility and catalog of data, metadata and databases","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/other-contents/accessibility-and-catalog-data-metadata-and-databases/"},"drupal_internal__nid":737775},"parent":[{"name":"Other contents","drupal_internal__tid":1597}]},"drupal_internal__tid":1599}},{"node":{"name":"Activities","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/activities/"},"drupal_internal__nid":300002135},"parent":[{"name":"Department","drupal_internal__tid":1474}]},"drupal_internal__tid":1846}},{"node":{"name":"Activities and procedures","weight":7,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/activities-and-procedures/"},"drupal_internal__nid":737256},"parent":[{"name":"Transparent administration","drupal_internal__tid":1499}]},"drupal_internal__tid":1546}},{"node":{"name":"Administrative management provisions","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/provisions/administrative-management-provisions/"},"drupal_internal__nid":737340},"parent":[{"name":"Provisions","drupal_internal__tid":1552}]},"drupal_internal__tid":1554}},{"node":{"name":"Agreements signed by the administration","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/provisions/administrative-management-provisions/agreements-signed-administration/"},"drupal_internal__nid":794339},"parent":[{"name":"Administrative management provisions","drupal_internal__tid":1554}]},"drupal_internal__tid":1557}},{"node":{"name":"Ammontare complessivo dei premi","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/performance/ammontare-complessivo-dei-premi/"},"drupal_internal__nid":794015},"parent":[{"name":"Performance","drupal_internal__tid":1531}]},"drupal_internal__tid":1534}},{"node":{"name":"Archive of agreements signed by the administration","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/provisions/administrative-management-provisions/agreements-signed-administration/archive-agreements-signed-administration/"},"drupal_internal__nid":1047867},"parent":[{"name":"Agreements signed by the administration","drupal_internal__tid":1557}]},"drupal_internal__tid":1558}},{"node":{"name":"Awards data","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/performance/awards-data/"},"drupal_internal__nid":737896},"parent":[{"name":"Performance","drupal_internal__tid":1531}]},"drupal_internal__tid":1535}},{"node":{"name":"Budget and final balance","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/budgets/budget-and-final-balance/"},"drupal_internal__nid":737193},"parent":[{"name":"Budgets","drupal_internal__tid":1568}]},"drupal_internal__tid":1570}},{"node":{"name":"Budgets","weight":12,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/budgets/"},"drupal_internal__nid":636544},"parent":[{"name":"Transparent administration","drupal_internal__tid":1499}]},"drupal_internal__tid":1568}},{"node":{"name":"Checks","weight":4,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/extraordinary-and-emergency-interventions/emergencies-meteo-hydro-risk/contributions-meteo-hydro-events-may-2013/checks/"},"drupal_internal__nid":739434},"parent":[{"name":"Contributions for meteo-hydro events of May 2013","drupal_internal__tid":1582}]},"drupal_internal__tid":1587}},{"node":{"name":"CIMA Foundation","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/controlled-bodies/controlled-private-law-entities/cima-foundation/"},"drupal_internal__nid":794079},"parent":[{"name":"Controlled private-law entities","drupal_internal__tid":1538}]},"drupal_internal__tid":1540}},{"node":{"name":"Civic access","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/other-contents/civic-access/"},"drupal_internal__nid":737795},"parent":[{"name":"Other contents","drupal_internal__tid":1597}]},"drupal_internal__tid":1600}},{"node":{"name":"Code of Conduct and Disciplinary Code","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/general-dispositions/general-acts/code-conduct-and-disciplinary-code/"},"drupal_internal__nid":738411},"parent":[{"name":"General acts","drupal_internal__tid":1502}]},"drupal_internal__tid":1507}},{"node":{"name":"Collective negotiation","weight":10,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/personnel/collective-negotiation/"},"drupal_internal__nid":738016},"parent":[{"name":"Personnel","drupal_internal__tid":1517}]},"drupal_internal__tid":1528}},{"node":{"name":"Competition announcements","weight":4,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/competition-announcements/"},"drupal_internal__nid":738532},"parent":[{"name":"Transparent administration","drupal_internal__tid":1499}]},"drupal_internal__tid":1516}},{"node":{"name":"Concession acts","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/economic-advantages/concession-acts/"},"drupal_internal__nid":737855},"parent":[{"name":"Economic Advantages","drupal_internal__tid":1560}]},"drupal_internal__tid":1562}},{"node":{"name":"Conferral requirements","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/meritorious-award/conferral-requirements/"},"drupal_internal__nid":894080},"parent":[{"name":"Meritorious Award","drupal_internal__tid":1489}]},"drupal_internal__tid":1490}},{"node":{"name":"Consultants and collaborators of the Department","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/consultants-and-collaborators-department/"},"drupal_internal__nid":742728},"parent":[{"name":"Transparent administration","drupal_internal__tid":1499}]},"drupal_internal__tid":2349}},{"node":{"name":"Contacts","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/department/contact-center/contacts/"},"drupal_internal__nid":300002417},"parent":[{"name":"Contact Center","drupal_internal__tid":1602}]},"drupal_internal__tid":1604}},{"node":{"name":"Contacts - Ukraine Emergency","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/department/contact-center/contacts-ukraine-emergency/"},"drupal_internal__nid":900004388},"parent":[{"name":"Contact Center","drupal_internal__tid":1602}]},"drupal_internal__tid":1985}},{"node":{"name":"Contributions for meteo-hydro events of May 2013","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/extraordinary-and-emergency-interventions/emergencies-meteo-hydro-risk/contributions-meteo-hydro-events-may-2013/"},"drupal_internal__nid":739484},"parent":[{"name":"Emergencies for meteo-hydro risk","drupal_internal__tid":1581}]},"drupal_internal__tid":1582}},{"node":{"name":"Contributions for meteo-hydro events of October 2018","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/extraordinary-and-emergency-interventions/emergencies-meteo-hydro-risk/contributions-meteo-hydro-events-october-2018/"},"drupal_internal__nid":1066704},"parent":[{"name":"Emergencies for meteo-hydro risk","drupal_internal__tid":1581}]},"drupal_internal__tid":1590}},{"node":{"name":"Controlled bodies","weight":6,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/controlled-bodies/"},"drupal_internal__nid":149930},"parent":[{"name":"Transparent administration","drupal_internal__tid":1499}]},"drupal_internal__tid":1537}},{"node":{"name":"Controlled private-law entities","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/controlled-bodies/controlled-private-law-entities/"},"drupal_internal__nid":149940},"parent":[{"name":"Controlled bodies","drupal_internal__tid":1537}]},"drupal_internal__tid":1538}},{"node":{"name":"Controlled public bodies","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/controlled-bodies/controlled-public-bodies/"},"drupal_internal__nid":149880},"parent":[{"name":"Controlled bodies","drupal_internal__tid":1537}]},"drupal_internal__tid":1542}},{"node":{"name":"Criteria and modalities","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/economic-advantages/criteria-and-modalities/"},"drupal_internal__nid":737865},"parent":[{"name":"Economic Advantages","drupal_internal__tid":1560}]},"drupal_internal__tid":1561}},{"node":{"name":"Deputy Head of Department","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/department/structure/deputy-head-department/"},"drupal_internal__nid":796275},"parent":[{"name":"Structure","drupal_internal__tid":1475}]},"drupal_internal__tid":1477}},{"node":{"name":"Diploma of public merit","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/department/meritorious-award/diploma-public-merit/"},"drupal_internal__nid":894252},"parent":[{"name":"Meritorious Award","drupal_internal__tid":1489}]},"drupal_internal__tid":1493}},{"node":{"name":"Donations","weight":4,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/other-contents/donations/"},"drupal_internal__nid":900012050},"parent":[{"name":"Other contents","drupal_internal__tid":1597}]},"drupal_internal__tid":2346}},{"node":{"name":"Economic Advantages","weight":11,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/economic-advantages/"},"drupal_internal__nid":153187},"parent":[{"name":"Transparent administration","drupal_internal__tid":1499}]},"drupal_internal__tid":1560}},{"node":{"name":"Emergencies","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/"},"relationships":{"field_sottodominio":{"name":"Emergenze"}},"drupal_internal__nid":1558},"parent":[{"name":"Thematic areas","drupal_internal__tid":1617}]},"drupal_internal__tid":1621}},{"node":{"name":"Emergencies for environmental, health, technological and fire risk","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/extraordinary-and-emergency-interventions/emergencies-environmental-health-technological-and-fire-risk/"},"drupal_internal__nid":150374},"parent":[{"name":"Extraordinary and emergency interventions","drupal_internal__tid":1580}]},"drupal_internal__tid":1592}},{"node":{"name":"Emergencies for meteo-hydro risk","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/extraordinary-and-emergency-interventions/emergencies-meteo-hydro-risk/"},"drupal_internal__nid":741016},"parent":[{"name":"Extraordinary and emergency interventions","drupal_internal__tid":1580}]},"drupal_internal__tid":1581}},{"node":{"name":"Eucentre Foundation","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/controlled-bodies/controlled-private-law-entities/eucentre-foundation/"},"drupal_internal__nid":794065},"parent":[{"name":"Controlled private-law entities","drupal_internal__tid":1538}]},"drupal_internal__tid":1539}},{"node":{"name":"European projects","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/other-contents/european-projects/"},"drupal_internal__nid":900012016},"parent":[{"name":"Other contents","drupal_internal__tid":1597}]},"drupal_internal__tid":1601}},{"node":{"name":"Evaluation board","weight":12,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/personnel/evaluation-board/"},"drupal_internal__nid":737996},"parent":[{"name":"Personnel","drupal_internal__tid":1517}]},"drupal_internal__tid":1530}},{"node":{"name":"Events","weight":7,"relationships":{"field_link_menu":{"fields":{"slug":"/"},"relationships":{"field_sottodominio":{"name":"Eventi"}},"drupal_internal__nid":395},"parent":[{"name":"Thematic areas","drupal_internal__tid":1617}]},"drupal_internal__tid":1628}},{"node":{"name":"Executive terminations","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/personnel/executive-terminations/"},"drupal_internal__nid":738096},"parent":[{"name":"Personnel","drupal_internal__tid":1517}]},"drupal_internal__tid":1520}},{"node":{"name":"Extraordinary and emergency interventions","weight":8,"relationships":{"field_link_menu":{"fields":{"slug":"/department/meritorious-award/extraordinary-and-emergency-interventions/"},"drupal_internal__nid":67641},"parent":[{"name":"Meritorious Award","drupal_internal__tid":1489}]},"drupal_internal__tid":1498}},{"node":{"name":"FAQ","weight":1,"relationships":{"field_link_menu":null,"parent":[{"name":"Emergencies for meteo-hydro risk","drupal_internal__tid":1581}]},"drupal_internal__tid":1589}},{"node":{"name":"Forms","weight":7,"relationships":{"field_link_menu":{"fields":{"slug":"/department/forms/"},"drupal_internal__nid":300001717},"parent":[{"name":"Department","drupal_internal__tid":1474}]},"drupal_internal__tid":1607}},{"node":{"name":"General acts","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/general-dispositions/general-acts/"},"drupal_internal__nid":738451},"parent":[{"name":"General dispositions","drupal_internal__tid":1500}]},"drupal_internal__tid":1502}},{"node":{"name":"General administrative acts","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/general-dispositions/general-acts/general-administrative-acts/"},"drupal_internal__nid":738431},"parent":[{"name":"General acts","drupal_internal__tid":1502}]},"drupal_internal__tid":1504}},{"node":{"name":"General dispositions","weight":0,"relationships":{"field_link_menu":null,"parent":[{"name":"Transparent administration","drupal_internal__tid":1499}]},"drupal_internal__tid":1500}},{"node":{"name":"Glossary","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/elenco-glossario--versione-inglese-/"},"drupal_internal__nid":1664},"parent":[{"name":"Homepage","drupal_internal__tid":1470}]},"drupal_internal__tid":1472}},{"node":{"name":"Graphic representation","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/controlled-bodies/graphic-representation/"},"drupal_internal__nid":740317},"parent":[{"name":"Controlled bodies","drupal_internal__tid":1537}]},"drupal_internal__tid":1541}},{"node":{"name":"Head of Department","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/structure/head-department/"},"drupal_internal__nid":796260},"parent":[{"name":"Structure","drupal_internal__tid":1475}]},"drupal_internal__tid":1476}},{"node":{"name":"Holders of executive positions","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/personnel/holders-executive-positions/"},"drupal_internal__nid":738106},"parent":[{"name":"Personnel","drupal_internal__tid":1517}]},"drupal_internal__tid":1518}},{"node":{"name":"Holders of political, administrative, management or government positions","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/organization/holders-political-administrative-management-or-government-positions/"},"drupal_internal__nid":738381},"parent":[{"name":"Organization","drupal_internal__tid":1509}]},"drupal_internal__tid":1510}},{"node":{"name":"Holders of top management positions in administration","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/personnel/holders-top-management-positions-administration/"},"drupal_internal__nid":793762},"parent":[{"name":"Personnel","drupal_internal__tid":1517}]},"drupal_internal__tid":1519}},{"node":{"name":"How the contribution is dispensed","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/extraordinary-and-emergency-interventions/emergencies-meteo-hydro-risk/contributions-meteo-hydro-events-may-2013/how-contribution-dispensed/"},"drupal_internal__nid":739444},"parent":[{"name":"Contributions for meteo-hydro events of May 2013","drupal_internal__tid":1582}]},"drupal_internal__tid":1586}},{"node":{"name":"How to apply","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/extraordinary-and-emergency-interventions/emergencies-meteo-hydro-risk/contributions-meteo-hydro-events-may-2013/how-apply/"},"drupal_internal__nid":739464},"parent":[{"name":"Contributions for meteo-hydro events of May 2013","drupal_internal__tid":1582}]},"drupal_internal__tid":1585}},{"node":{"name":"Information obligations for citizend and firms","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/general-dispositions/information-obligations-citizend-and-firms/"},"drupal_internal__nid":738401},"parent":[{"name":"General dispositions","drupal_internal__tid":1500}]},"drupal_internal__tid":1508}},{"node":{"name":"Insegna","weight":4,"relationships":{"field_link_menu":{"fields":{"slug":"/department/meritorious-award/insegna/"},"drupal_internal__nid":894264},"parent":[{"name":"Meritorious Award","drupal_internal__tid":1489}]},"drupal_internal__tid":1494}},{"node":{"name":"Insurance claims and other contributions","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/extraordinary-and-emergency-interventions/emergencies-meteo-hydro-risk/contributions-meteo-hydro-events-may-2013/insurance-claims-and-other-contributions/"},"drupal_internal__nid":739454},"parent":[{"name":"Contributions for meteo-hydro events of May 2013","drupal_internal__tid":1582}]},"drupal_internal__tid":1583}},{"node":{"name":"Integrated Plan of Activities and Organisation (PIAO) 2023-2025","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/general-dispositions/integrated-plan-activities-and-organisation-piao-2023-2025/"},"drupal_internal__nid":900009362},"parent":[{"name":"General dispositions","drupal_internal__tid":1500}]},"drupal_internal__tid":2186}},{"node":{"name":"Integrative negotiation","weight":11,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/personnel/integrative-negotiation/"},"drupal_internal__nid":738006},"parent":[{"name":"Personnel","drupal_internal__tid":1517}]},"drupal_internal__tid":1529}},{"node":{"name":"International Relations","weight":4,"relationships":{"field_link_menu":{"fields":{"slug":"/"},"relationships":{"field_sottodominio":{"name":"Relazioni internazionali"}},"drupal_internal__nid":1550},"parent":[{"name":"Thematic areas","drupal_internal__tid":1617}]},"drupal_internal__tid":1622}},{"node":{"name":"International states of emergency","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/extraordinary-and-emergency-interventions/international-states-emergency/"},"drupal_internal__nid":740536},"parent":[{"name":"Extraordinary and emergency interventions","drupal_internal__tid":1580}]},"drupal_internal__tid":1593}},{"node":{"name":"Latest news","weight":0,"relationships":{"field_link_menu":null,"parent":[{"name":"Press area","drupal_internal__tid":1609}]},"drupal_internal__tid":1610}},{"node":{"name":"Legal Measure","weight":8,"relationships":{"field_link_menu":{"fields":{"slug":"/legal-measure/"},"drupal_internal__nid":4581},"parent":[{"name":"Transparent administration","drupal_internal__tid":1499}]},"drupal_internal__tid":1550}},{"node":{"name":"List and register of beneficiaries","weight":6,"relationships":{"field_link_menu":{"fields":{"slug":"/department/meritorious-award/list-and-register-beneficiaries/"},"drupal_internal__nid":894294},"parent":[{"name":"Meritorious Award","drupal_internal__tid":1489}]},"drupal_internal__tid":1496}},{"node":{"name":"Maps","weight":8,"relationships":{"field_link_menu":{"fields":{"slug":"/"},"relationships":{"field_sottodominio":{"name":"Mappe"}},"drupal_internal__nid":1556},"parent":[{"name":"Thematic areas","drupal_internal__tid":1617}]},"drupal_internal__tid":1627}},{"node":{"name":"Media Kit","weight":1,"relationships":{"field_link_menu":null,"parent":[{"name":"Press area","drupal_internal__tid":1609}]},"drupal_internal__tid":1611}},{"node":{"name":"Meritorious Award","weight":4,"relationships":{"field_link_menu":{"fields":{"slug":"/department/meritorious-award/"},"drupal_internal__nid":300001699},"parent":[{"name":"Department","drupal_internal__tid":1474}]},"drupal_internal__tid":1489}},{"node":{"name":"Mobility procedures","weight":9,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/personnel/mobility-procedures/"},"drupal_internal__nid":738026},"parent":[{"name":"Personnel","drupal_internal__tid":1517}]},"drupal_internal__tid":1527}},{"node":{"name":"Monitoraggio tempi procedimentali","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/activities-and-procedures/monitoraggio-tempi-procedimentali/"},"drupal_internal__nid":737236},"parent":[{"name":"Activities and procedures","drupal_internal__tid":1546}]},"drupal_internal__tid":1548}},{"node":{"name":"Mortgage payments","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/economic-advantages/concession-acts/mortgage-payments/"},"drupal_internal__nid":153207},"parent":[{"name":"Concession acts","drupal_internal__tid":1562}]},"drupal_internal__tid":1563}},{"node":{"name":"National Recovery and Resilience Plan objectives","weight":11,"relationships":{"field_link_menu":{"fields":{"slug":"/"},"relationships":{"field_sottodominio":{"name":"Attuazione Misure PNRR"}},"drupal_internal__nid":900004848},"parent":[{"name":"Thematic areas","drupal_internal__tid":1617}]},"drupal_internal__tid":2016}},{"node":{"name":"National Service","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/"},"relationships":{"field_sottodominio":{"name":"Servizio Nazionale"}},"drupal_internal__nid":1516},"parent":[{"name":"Thematic areas","drupal_internal__tid":1617}]},"drupal_internal__tid":1619}},{"node":{"name":"Offices outline","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/organization/offices-outline/"},"drupal_internal__nid":738361},"parent":[{"name":"Organization","drupal_internal__tid":1509}]},"drupal_internal__tid":1513}},{"node":{"name":"Organization","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/organization/"},"drupal_internal__nid":742829},"parent":[{"name":"Transparent administration","drupal_internal__tid":1499}]},"drupal_internal__tid":1509}},{"node":{"name":"Organizational positions","weight":4,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/personnel/organizational-positions/"},"drupal_internal__nid":738076},"parent":[{"name":"Personnel","drupal_internal__tid":1517}]},"drupal_internal__tid":1522}},{"node":{"name":"Organizational wellbeing","weight":4,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/performance/organizational-wellbeing/"},"drupal_internal__nid":737886},"parent":[{"name":"Performance","drupal_internal__tid":1531}]},"drupal_internal__tid":1536}},{"node":{"name":"Payments data","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/administration-payments/payments-data/"},"drupal_internal__nid":737310},"parent":[{"name":"Administration payments","drupal_internal__tid":1576}]},"drupal_internal__tid":1577}},{"node":{"name":"Performance","weight":5,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/performance/"},"drupal_internal__nid":150250},"parent":[{"name":"Transparent administration","drupal_internal__tid":1499}]},"drupal_internal__tid":1531}},{"node":{"name":"Performance measuring and evaluating systems","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/performance/performance-measuring-and-evaluating-systems/"},"drupal_internal__nid":737926},"parent":[{"name":"Performance","drupal_internal__tid":1531}]},"drupal_internal__tid":1532}},{"node":{"name":"Performance plan and report","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/performance/performance-plan-and-report/"},"drupal_internal__nid":737916},"parent":[{"name":"Performance","drupal_internal__tid":1531}]},"drupal_internal__tid":1533}},{"node":{"name":"Permanent commission","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/department/meritorious-award/permanent-commission/"},"drupal_internal__nid":894175},"parent":[{"name":"Meritorious Award","drupal_internal__tid":1489}]},"drupal_internal__tid":1492}},{"node":{"name":"Personnel","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/personnel/"},"drupal_internal__nid":152494},"parent":[{"name":"Transparent administration","drupal_internal__tid":1499}]},"drupal_internal__tid":1517}},{"node":{"name":"Personnel assigned to offices and services of the Department","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/organization/personnel-assigned-offices-and-services-department/"},"drupal_internal__nid":742010},"parent":[{"name":"Organization","drupal_internal__tid":1509}]},"drupal_internal__tid":1511}},{"node":{"name":"Photo and video","weight":4,"relationships":{"field_link_menu":{"fields":{"slug":"/photo-and-video-/"},"drupal_internal__nid":4585},"parent":[{"name":"Media and Communication","drupal_internal__tid":1608}]},"drupal_internal__tid":1615}},{"node":{"name":"Plan of indicators and expected budget results","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/budgets/plan-indicators-and-expected-budget-results/"},"drupal_internal__nid":737182},"parent":[{"name":"Budgets","drupal_internal__tid":1568}]},"drupal_internal__tid":1569}},{"node":{"name":"Political bodies provisions","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/provisions/political-bodies-provisions/"},"drupal_internal__nid":737350},"parent":[{"name":"Provisions","drupal_internal__tid":1552}]},"drupal_internal__tid":1553}},{"node":{"name":"Premises","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/department/premises/"},"drupal_internal__nid":300001709},"parent":[{"name":"Department","drupal_internal__tid":1474}]},"drupal_internal__tid":1487}},{"node":{"name":"Press area","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/media-and-communication/press-area/"},"drupal_internal__nid":300000472},"parent":[{"name":"Media and Communication","drupal_internal__tid":1608}]},"drupal_internal__tid":1609}},{"node":{"name":"Prevention of corruption","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/other-contents/prevention-corruption/"},"drupal_internal__nid":737785},"parent":[{"name":"Other contents","drupal_internal__tid":1597}]},"drupal_internal__tid":1598}},{"node":{"name":"Procedure for the conferral","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/department/meritorious-award/procedure-conferral/"},"drupal_internal__nid":894164},"parent":[{"name":"Meritorious Award","drupal_internal__tid":1489}]},"drupal_internal__tid":1491}},{"node":{"name":"Procedures data","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/provisions/administrative-management-provisions/procedures-data/"},"drupal_internal__nid":737330},"parent":[{"name":"Administrative management provisions","drupal_internal__tid":1554}]},"drupal_internal__tid":1555}},{"node":{"name":"Provisions","weight":9,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/provisions/"},"drupal_internal__nid":153362},"parent":[{"name":"Transparent administration","drupal_internal__tid":1499}]},"drupal_internal__tid":1552}},{"node":{"name":"Publications","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/publications/"},"drupal_internal__nid":1668},"parent":[{"name":"Media and Communication","drupal_internal__tid":1608}]},"drupal_internal__tid":1613}},{"node":{"name":"Q&A","weight":9,"relationships":{"field_link_menu":{"fields":{"slug":"/"},"relationships":{"field_sottodominio":{"name":"Domande e risposte"}},"drupal_internal__nid":300000828},"parent":[{"name":"Thematic areas","drupal_internal__tid":1617}]},"drupal_internal__tid":1623}},{"node":{"name":"Register of companies and procedures for accreditation","weight":5,"relationships":{"field_link_menu":{"fields":{"slug":"/department/meritorious-award/register-companies-and-procedures-accreditation/"},"drupal_internal__nid":894274},"parent":[{"name":"Meritorious Award","drupal_internal__tid":1489}]},"drupal_internal__tid":1495}},{"node":{"name":"Regulations","weight":7,"relationships":{"field_link_menu":{"fields":{"slug":"/department/meritorious-award/regulations/"},"drupal_internal__nid":894342},"parent":[{"name":"Meritorious Award","drupal_internal__tid":1489}]},"drupal_internal__tid":1497}},{"node":{"name":"Regulatory references on organizations and activities","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/general-dispositions/general-acts/regulatory-references-organizations-and-activities/"},"drupal_internal__nid":738441},"parent":[{"name":"General acts","drupal_internal__tid":1502}]},"drupal_internal__tid":1503}},{"node":{"name":"ReLuis Consortium","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/controlled-bodies/controlled-public-bodies/reluis-consortium/"},"drupal_internal__nid":794128},"parent":[{"name":"Controlled public bodies","drupal_internal__tid":1542}]},"drupal_internal__tid":1543}},{"node":{"name":"Rental and lease","weight":13,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/rental-and-lease/"},"drupal_internal__nid":150260},"parent":[{"name":"Transparent administration","drupal_internal__tid":1499}]},"drupal_internal__tid":1571}},{"node":{"name":"Replacement declarations and ex officio acquisition of data","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/activities-and-procedures/replacement-declarations-and-ex-officio-acquisition-data/"},"drupal_internal__nid":737225},"parent":[{"name":"Activities and procedures","drupal_internal__tid":1546}]},"drupal_internal__tid":1549}},{"node":{"name":"Request of patronage","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/department/request-patronage/"},"drupal_internal__nid":300001719},"parent":[{"name":"Department","drupal_internal__tid":1474}]},"drupal_internal__tid":1488}},{"node":{"name":"RETURN Foundation (Multi- Risk sciEnce for resilienT commUnities undeR a changiNg climate)","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/controlled-bodies/controlled-private-law-entities/return-foundation-multi-risk-science-resilient-communities-under-changing-climate/"},"drupal_internal__nid":900010280},"parent":[{"name":"Controlled private-law entities","drupal_internal__tid":1538}]},"drupal_internal__tid":2213}},{"node":{"name":"Risks","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/"},"relationships":{"field_sottodominio":{"name":"Rischi"}},"drupal_internal__nid":440},"parent":[{"name":"Thematic areas","drupal_internal__tid":1617}]},"drupal_internal__tid":1620}},{"node":{"name":"Sanctions for failed data communication","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/organization/sanctions-failed-data-communication/"},"drupal_internal__nid":900000844},"parent":[{"name":"Organization","drupal_internal__tid":1509}]},"drupal_internal__tid":1512}},{"node":{"name":"Sanctions for failed data communication","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/personnel/sanctions-failed-data-communication/"},"drupal_internal__nid":793791},"parent":[{"name":"Personnel","drupal_internal__tid":1517}]},"drupal_internal__tid":1521}},{"node":{"name":"Service Features","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/contact-center/service-features/"},"drupal_internal__nid":100838033},"parent":[{"name":"Contact Center","drupal_internal__tid":1602}]},"drupal_internal__tid":1603}},{"node":{"name":"Sitemap","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/homepage/sitemap/"},"drupal_internal__nid":422},"parent":[{"name":"Homepage","drupal_internal__tid":1470}]},"drupal_internal__tid":1473}},{"node":{"name":"Social","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/media-and-communication/social/"},"drupal_internal__nid":300001731},"parent":[{"name":"Media and Communication","drupal_internal__tid":1608}]},"drupal_internal__tid":1614}},{"node":{"name":"Special cases","weight":5,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/extraordinary-and-emergency-interventions/emergencies-meteo-hydro-risk/contributions-meteo-hydro-events-may-2013/special-cases/"},"drupal_internal__nid":739424},"parent":[{"name":"Contributions for meteo-hydro events of May 2013","drupal_internal__tid":1582}]},"drupal_internal__tid":1588}},{"node":{"name":"States of emergency for seismic risk","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/extraordinary-and-emergency-interventions/states-emergency-seismic-risk/"},"drupal_internal__nid":740582},"parent":[{"name":"Extraordinary and emergency interventions","drupal_internal__tid":1580}]},"drupal_internal__tid":1591}},{"node":{"name":"States of emergency not managed by the Department","weight":4,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/extraordinary-and-emergency-interventions/states-emergency-not-managed-department/"},"drupal_internal__nid":740513},"parent":[{"name":"Extraordinary and emergency interventions","drupal_internal__tid":1580}]},"drupal_internal__tid":1594}},{"node":{"name":"Strategic and management planning documents","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/general-dispositions/general-acts/strategic-and-management-planning-documents/"},"drupal_internal__nid":738421},"parent":[{"name":"General acts","drupal_internal__tid":1502}]},"drupal_internal__tid":1505}},{"node":{"name":"Subsidiary companies","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/controlled-bodies/subsidiary-companies/"},"drupal_internal__nid":740276},"parent":[{"name":"Controlled bodies","drupal_internal__tid":1537}]},"drupal_internal__tid":1544}},{"node":{"name":"Supervised public bodies","weight":4,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/controlled-bodies/supervised-public-bodies/"},"drupal_internal__nid":740266},"parent":[{"name":"Controlled bodies","drupal_internal__tid":1537}]},"drupal_internal__tid":1545}},{"node":{"name":"Supplementary worksheet","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/-supplementary-worksheet/"},"drupal_internal__nid":1374051},"parent":[{"name":"Media and Communication","drupal_internal__tid":1608}]},"drupal_internal__tid":1612}},{"node":{"name":"Systematic equipment","weight":5,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/personnel/systematic-equipment/"},"drupal_internal__nid":738066},"parent":[{"name":"Personnel","drupal_internal__tid":1517}]},"drupal_internal__tid":1523}},{"node":{"name":"Tasks assigned and authorized to public servants","weight":8,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/personnel/tasks-assigned-and-authorized-public-servants/"},"drupal_internal__nid":738036},"parent":[{"name":"Personnel","drupal_internal__tid":1517}]},"drupal_internal__tid":1526}},{"node":{"name":"Technical attachments to the ordinances for recognition of the requirements","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/legal-measure/technical-attachments-ordinances-recognition-requirements/"},"drupal_internal__nid":741657},"parent":[{"name":"Legal Measure","drupal_internal__tid":1550}]},"drupal_internal__tid":1551}},{"node":{"name":"Telephone and email","weight":4,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/organization/telephone-and-email/"},"drupal_internal__nid":793720},"parent":[{"name":"Organization","drupal_internal__tid":1509}]},"drupal_internal__tid":1514}},{"node":{"name":"Temporary personnel","weight":6,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/personnel/temporary-personnel/"},"drupal_internal__nid":738056},"parent":[{"name":"Personnel","drupal_internal__tid":1517}]},"drupal_internal__tid":1524}},{"node":{"name":"Tender and contract list","weight":0,"relationships":{"field_link_menu":null,"parent":[{"name":"Tenders and contracts","drupal_internal__tid":1559}]},"drupal_internal__tid":1878}},{"node":{"name":"Tenders and contracts","weight":10,"relationships":{"field_link_menu":null,"parent":[{"name":"Transparent administration","drupal_internal__tid":1499}]},"drupal_internal__tid":1559}},{"node":{"name":"Three-year plan for the prevention of corruption and transparency","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/general-dispositions/three-year-plan-prevention-corruption-and-transparency/"},"drupal_internal__nid":738461},"parent":[{"name":"General dispositions","drupal_internal__tid":1500}]},"drupal_internal__tid":1501}},{"node":{"name":"Training","weight":6,"relationships":{"field_link_menu":{"fields":{"slug":"/"},"relationships":{"field_sottodominio":{"name":"Formazione"}},"drupal_internal__nid":1566},"parent":[{"name":"Thematic areas","drupal_internal__tid":1617}]},"drupal_internal__tid":1624}},{"node":{"name":"Transfers for civil protecion emergencies","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/economic-advantages/concession-acts/transfers-civil-protecion-emergencies/"},"drupal_internal__nid":990363},"parent":[{"name":"Concession acts","drupal_internal__tid":1562}]},"drupal_internal__tid":1564}},{"node":{"name":"Transfers for national and international civil protection exercises","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/economic-advantages/concession-acts/transfers-national-and-international-civil-protection-exercises/"},"drupal_internal__nid":152541},"parent":[{"name":"Concession acts","drupal_internal__tid":1562}]},"drupal_internal__tid":1565}},{"node":{"name":"Transfers ruled by art.11","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/economic-advantages/concession-acts/transfers-ruled-art11/"},"drupal_internal__nid":795880},"parent":[{"name":"Concession acts","drupal_internal__tid":1562}]},"drupal_internal__tid":1566}},{"node":{"name":"Transfers to the Regions for the management of hydro-meteo-pluviometric networks","weight":4,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/economic-advantages/concession-acts/transfers-regions-management-hydro-meteo-pluviometric-networks/"},"drupal_internal__nid":149758},"parent":[{"name":"Concession acts","drupal_internal__tid":1562}]},"drupal_internal__tid":1567}},{"node":{"name":"Transparent administration","weight":5,"relationships":{"field_link_menu":{"fields":{"slug":"/sezione-con-anticipazioni/transparent-administration/"},"drupal_internal__nid":399},"parent":[{"name":"Department","drupal_internal__tid":1474}]},"drupal_internal__tid":1499}},{"node":{"name":"Type of damage and goods elegible for contribution","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/extraordinary-and-emergency-interventions/emergencies-meteo-hydro-risk/contributions-meteo-hydro-events-may-2013/type-damage-and-goods-elegible-contribution/"},"drupal_internal__nid":739474},"parent":[{"name":"Contributions for meteo-hydro events of May 2013","drupal_internal__tid":1582}]},"drupal_internal__tid":1584}},{"node":{"name":"Types of procedure","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/activities-and-procedures/types-procedure/"},"drupal_internal__nid":737246},"parent":[{"name":"Activities and procedures","drupal_internal__tid":1546}]},"drupal_internal__tid":1547}},{"node":{"name":"Volunteering","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/"},"relationships":{"field_sottodominio":{"name":"Volontariato"}},"drupal_internal__nid":1568},"parent":[{"name":"Thematic areas","drupal_internal__tid":1617}]},"drupal_internal__tid":1618}},{"node":{"name":"Write to Contact Center","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/department/contact-center/write-contact-center/"},"drupal_internal__nid":300001729},"parent":[{"name":"Contact Center","drupal_internal__tid":1602}]},"drupal_internal__tid":1605}},{"node":{"name":"Young people","weight":5,"relationships":{"field_link_menu":{"fields":{"slug":"/"},"relationships":{"field_sottodominio":{"name":"Giovani"}},"drupal_internal__nid":1546},"parent":[{"name":"Thematic areas","drupal_internal__tid":1617}]},"drupal_internal__tid":1625}}],"menuMinisito":[{"node":{"name":"Are you prepared?","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/health/are-you-prepared/"},"drupal_internal__nid":900013593},"parent":[{"name":"Health","drupal_internal__tid":1711}]},"drupal_internal__tid":1713}},{"node":{"name":"Activities","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/health/activities/"},"drupal_internal__nid":900013591},"parent":[{"name":"Health","drupal_internal__tid":1711}]},"drupal_internal__tid":1712}},{"node":{"name":"Activities","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/nuclear/activities/"},"drupal_internal__nid":900013581},"parent":[{"name":"Nuclear","drupal_internal__tid":1717}]},"drupal_internal__tid":1718}},{"node":{"name":"Are you prepared?","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/nuclear/are-you-prepared/"},"drupal_internal__nid":900013585},"parent":[{"name":"Nuclear","drupal_internal__tid":1717}]},"drupal_internal__tid":1719}},{"node":{"name":"Activities","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/tsunami/activities/"},"drupal_internal__nid":900013583},"parent":[{"name":"Tsunami","drupal_internal__tid":1702}]},"drupal_internal__tid":1704}},{"node":{"name":"Are you prepared?","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/fire/are-you-prepared/"},"drupal_internal__nid":900013579},"parent":[{"name":"Fire","drupal_internal__tid":1706}]},"drupal_internal__tid":1710}},{"node":{"name":"Are you prepared?","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/tsunami/are-you-prepared/"},"drupal_internal__nid":900013577},"parent":[{"name":"Tsunami","drupal_internal__tid":1702}]},"drupal_internal__tid":1705}},{"node":{"name":"Activities","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/fire/activities/"},"drupal_internal__nid":900013575},"parent":[{"name":"Fire","drupal_internal__tid":1706}]},"drupal_internal__tid":1708}},{"node":{"name":"Forest fire","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/fire/forest-fire/"},"drupal_internal__nid":900013571},"parent":[{"name":"Fire","drupal_internal__tid":1706}]},"drupal_internal__tid":1707}},{"node":{"name":"Tsunami","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/tsunami/tsunami/"},"drupal_internal__nid":900013573},"parent":[{"name":"Tsunami","drupal_internal__tid":1702}]},"drupal_internal__tid":1703}},{"node":{"name":"Activities","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/activities/"},"drupal_internal__nid":155570},"parent":[{"name":"Seismic","drupal_internal__tid":1634}]},"drupal_internal__tid":1637}},{"node":{"name":"Activities","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/meteo-hydro/activities/"},"drupal_internal__nid":332227},"parent":[{"name":"Meteo-Hydro","drupal_internal__tid":1662}]},"drupal_internal__tid":1664}},{"node":{"name":"Activities","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/volcanic/activities/"},"drupal_internal__nid":155580},"parent":[{"name":"Volcanic","drupal_internal__tid":1675}]},"drupal_internal__tid":1698}},{"node":{"name":"Activities","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/industrial/activities/"},"drupal_internal__nid":900011896},"parent":[{"name":"Industrial","drupal_internal__tid":1721}]},"drupal_internal__tid":1722}},{"node":{"name":"Activities","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/large-dams/activities/"},"drupal_internal__nid":900011918},"parent":[{"name":"Large dams","drupal_internal__tid":2340}]},"drupal_internal__tid":2342}},{"node":{"name":"Alert","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/meteo-hydro/alert/"},"drupal_internal__nid":300001721},"parent":[{"name":"Meteo-Hydro","drupal_internal__tid":1662}]},"drupal_internal__tid":1668}},{"node":{"name":"Alerts and criticality scenarios table","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/meteo-hydro/alert/alerts-and-criticality-scenarios-table/"},"drupal_internal__nid":811957},"parent":[{"name":"Alert","drupal_internal__tid":1668}]},"drupal_internal__tid":1669}},{"node":{"name":"Are you prepared?","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/are-you-prepared/"},"drupal_internal__nid":50697},"parent":[{"name":"Seismic","drupal_internal__tid":1634}]},"drupal_internal__tid":1659}},{"node":{"name":"Are you prepared?","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/meteo-hydro/are-you-prepared/"},"drupal_internal__nid":51053},"parent":[{"name":"Meteo-Hydro","drupal_internal__tid":1662}]},"drupal_internal__tid":1672}},{"node":{"name":"Are you prepared?","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/volcanic/are-you-prepared/"},"drupal_internal__nid":76780},"parent":[{"name":"Volcanic","drupal_internal__tid":1675}]},"drupal_internal__tid":1699}},{"node":{"name":"Are you prepared?","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/industrial/are-you-prepared/"},"drupal_internal__nid":900011902},"parent":[{"name":"Industrial","drupal_internal__tid":1721}]},"drupal_internal__tid":1723}},{"node":{"name":"Are you prepared?","weight":4,"relationships":{"field_link_menu":{"fields":{"slug":"/volcanic/volcanoes-italy/phlegraen-fields/bradyseism-phlegraean-fields/are-you-prepared/"},"drupal_internal__nid":900011444},"parent":[{"name":"Bradyseism in the Phlegraean Fields","drupal_internal__tid":2297}]},"drupal_internal__tid":2303}},{"node":{"name":"Are you prepared?","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/large-dams/are-you-prepared/"},"drupal_internal__nid":900011920},"parent":[{"name":"Large dams","drupal_internal__tid":2340}]},"drupal_internal__tid":2343}},{"node":{"name":"Bradyseism in the Phlegraean Fields","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/volcanic/volcanoes-italy/phlegraen-fields/bradyseism-phlegraean-fields/"},"drupal_internal__nid":900011500},"parent":[{"name":"Phlegraen Fields","drupal_internal__tid":1688}]},"drupal_internal__tid":2297}},{"node":{"name":"Census of historical centers exposed to seismic risk","weight":7,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/activities/emergency-planning-and-damage-scenarios/census-historical-centers-exposed-seismic-risk/"},"drupal_internal__nid":174642},"parent":[{"name":"Emergency planning and damage scenarios","drupal_internal__tid":1641}]},"drupal_internal__tid":1648}},{"node":{"name":"Central Functional Centre","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/meteo-hydro/activities/central-functional-centre/"},"drupal_internal__nid":635282},"parent":[{"name":"Activities","drupal_internal__tid":1664}]},"drupal_internal__tid":1665}},{"node":{"name":"Colli Albani","weight":7,"relationships":{"field_link_menu":{"fields":{"slug":"/volcanic/volcanoes-italy/colli-albani/"},"drupal_internal__nid":669834},"parent":[{"name":"Volcanoes in Italy","drupal_internal__tid":1677}]},"drupal_internal__tid":1694}},{"node":{"name":"Earthquakes","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/earthquakes/"},"drupal_internal__nid":177296},"parent":[{"name":"Seismic","drupal_internal__tid":1634}]},"drupal_internal__tid":1636}},{"node":{"name":"Effects","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/large-dams/effects/"},"drupal_internal__nid":900011916},"parent":[{"name":"Large dams","drupal_internal__tid":2340}]},"drupal_internal__tid":2341}},{"node":{"name":"Emergency planning and damage scenarios","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/activities/emergency-planning-and-damage-scenarios/"},"drupal_internal__nid":67126},"parent":[{"name":"Activities","drupal_internal__tid":1637}]},"drupal_internal__tid":1641}},{"node":{"name":"Environmental","weight":89,"relationships":{"field_link_menu":{"fields":{"slug":"/environmental-0/"},"drupal_internal__nid":100838003},"parent":[]},"drupal_internal__tid":1715}},{"node":{"name":"Etna","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/volcanic/volcanoes-italy/etna/"},"drupal_internal__nid":52987},"parent":[{"name":"Volcanoes in Italy","drupal_internal__tid":1677}]},"drupal_internal__tid":1683}},{"node":{"name":"Events","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/meteo-hydro/events/"},"drupal_internal__nid":177145},"parent":[{"name":"Meteo-Hydro","drupal_internal__tid":1662}]},"drupal_internal__tid":1663}},{"node":{"name":"Exposure","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/activities/emergency-planning-and-damage-scenarios/exposure/"},"drupal_internal__nid":818432},"parent":[{"name":"Emergency planning and damage scenarios","drupal_internal__tid":1641}]},"drupal_internal__tid":1643}},{"node":{"name":"Fire","weight":87,"relationships":{"field_link_menu":{"fields":{"slug":"/sezione-con-anticipazioni/forest-fire-risk/"},"drupal_internal__nid":100837999},"parent":[]},"drupal_internal__tid":1706}},{"node":{"name":"Health","weight":88,"relationships":{"field_link_menu":{"fields":{"slug":"/sezione-con-anticipazioni/health-risk/"},"drupal_internal__nid":100838001},"parent":[]},"drupal_internal__tid":1711}},{"node":{"name":"In-depth information","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/depth-information/"},"drupal_internal__nid":900002364},"parent":[{"name":"Seismic","drupal_internal__tid":1634}]},"drupal_internal__tid":1661}},{"node":{"name":"In-depth information","weight":4,"relationships":{"field_link_menu":{"fields":{"slug":"/meteo-hydro/depth-information/"},"drupal_internal__nid":300000886},"parent":[{"name":"Meteo-Hydro","drupal_internal__tid":1662}]},"drupal_internal__tid":1674}},{"node":{"name":"In-depth information","weight":4,"relationships":{"field_link_menu":{"fields":{"slug":"/volcanic/depth-information/"},"drupal_internal__nid":300000888},"parent":[{"name":"Volcanic","drupal_internal__tid":1675}]},"drupal_internal__tid":1701}},{"node":{"name":"In-depth information","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/fire/depth-information/"},"drupal_internal__nid":880060},"parent":[{"name":"Fire","drupal_internal__tid":1706}]},"drupal_internal__tid":1709}},{"node":{"name":"In-depth information","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/health/depth-information/"},"drupal_internal__nid":300000872},"parent":[{"name":"Health","drupal_internal__tid":1711}]},"drupal_internal__tid":1714}},{"node":{"name":"In-depth information","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/environmental/depth-information/"},"drupal_internal__nid":880127},"parent":[{"name":"Environmental","drupal_internal__tid":1715}]},"drupal_internal__tid":1716}},{"node":{"name":"In-depth information","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/nuclear/depth-information/"},"drupal_internal__nid":300000920},"parent":[{"name":"Nuclear","drupal_internal__tid":1717}]},"drupal_internal__tid":1720}},{"node":{"name":"Industrial","weight":91,"relationships":{"field_link_menu":{"fields":{"slug":"/sezione-con-anticipazioni/industrial-risk-of-major-accident/"},"drupal_internal__nid":100838007},"parent":[]},"drupal_internal__tid":1721}},{"node":{"name":"Infographic on meteo-hydro alert","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/meteo-hydro/alert/infographic-meteo-hydro-alert/"},"drupal_internal__nid":863087},"parent":[{"name":"Alert","drupal_internal__tid":1668}]},"drupal_internal__tid":1671}},{"node":{"name":"International Commission on Earthquake Forecasting for Civil Protection","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/activities/emergency-planning-and-damage-scenarios/international-commission-earthquake-forecasting-civil-protection/"},"drupal_internal__nid":78718},"parent":[{"name":"Emergency planning and damage scenarios","drupal_internal__tid":1641}]},"drupal_internal__tid":1842}},{"node":{"name":"Ischia","weight":5,"relationships":{"field_link_menu":{"fields":{"slug":"/volcanic/volcanoes-italy/ischia/"},"drupal_internal__nid":61420},"parent":[{"name":"Volcanoes in Italy","drupal_internal__tid":1677}]},"drupal_internal__tid":1691}},{"node":{"name":"Large dams","weight":92,"relationships":{"field_link_menu":{"fields":{"slug":"/large-dams/"},"drupal_internal__nid":900011972},"parent":[]},"drupal_internal__tid":2340}},{"node":{"name":"Lipari","weight":8,"relationships":{"field_link_menu":{"fields":{"slug":"/volcanic/volcanoes-italy/lipari/"},"drupal_internal__nid":669794},"parent":[{"name":"Volcanoes in Italy","drupal_internal__tid":1677}]},"drupal_internal__tid":1695}},{"node":{"name":"Meteo-Hydro","weight":84,"relationships":{"field_link_menu":{"fields":{"slug":"/sezione-con-anticipazioni/meteo-hydro/"},"drupal_internal__nid":100837987},"parent":[]},"drupal_internal__tid":1662}},{"node":{"name":"Meteo-hydro warning on regional structures websites","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/meteo-hydro/alert/meteo-hydro-warning-regional-structures-websites/"},"drupal_internal__nid":152310},"parent":[{"name":"Alert","drupal_internal__tid":1668}]},"drupal_internal__tid":1670}},{"node":{"name":"Monitoring","weight":6,"relationships":{"field_link_menu":{"fields":{"slug":"/volcanic/volcanoes-italy/phlegraen-fields/bradyseism-phlegraean-fields/monitoring/"},"drupal_internal__nid":900011440},"parent":[{"name":"Bradyseism in the Phlegraean Fields","drupal_internal__tid":2297}]},"drupal_internal__tid":2301}},{"node":{"name":"Monitoring and Surveillance","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/meteo-hydro/activities/central-functional-centre/monitoring-and-surveillance/"},"drupal_internal__nid":781665},"parent":[{"name":"Central Functional Centre","drupal_internal__tid":1665}]},"drupal_internal__tid":1667}},{"node":{"name":"National plan for seismic risk prevention","weight":8,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/activities/emergency-planning-and-damage-scenarios/national-plan-seismic-risk-prevention/"},"drupal_internal__nid":67766},"parent":[{"name":"Emergency planning and damage scenarios","drupal_internal__tid":1641}]},"drupal_internal__tid":1649}},{"node":{"name":"Nuclear","weight":90,"relationships":{"field_link_menu":{"fields":{"slug":"/sezione-con-anticipazioni/nuclear-risk/"},"drupal_internal__nid":100838005},"parent":[]},"drupal_internal__tid":1717}},{"node":{"name":"Oss - Seismic Observatory of Structures","weight":5,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/activities/emergency-planning-and-damage-scenarios/oss-seismic-observatory-structures/"},"drupal_internal__nid":66117},"parent":[{"name":"Emergency planning and damage scenarios","drupal_internal__tid":1641}]},"drupal_internal__tid":1646}},{"node":{"name":"Panarea","weight":9,"relationships":{"field_link_menu":{"fields":{"slug":"/volcanic/volcanoes-italy/panarea/"},"drupal_internal__nid":669754},"parent":[{"name":"Volcanoes in Italy","drupal_internal__tid":1677}]},"drupal_internal__tid":1696}},{"node":{"name":"Pantelleria","weight":6,"relationships":{"field_link_menu":{"fields":{"slug":"/volcanic/volcanoes-italy/pantelleria/"},"drupal_internal__nid":669874},"parent":[{"name":"Volcanoes in Italy","drupal_internal__tid":1677}]},"drupal_internal__tid":1693}},{"node":{"name":"Past events","weight":7,"relationships":{"field_link_menu":{"fields":{"slug":"/volcanic/volcanoes-italy/phlegraen-fields/bradyseism-phlegraean-fields/past-events/"},"drupal_internal__nid":900011438},"parent":[{"name":"Bradyseism in the Phlegraean Fields","drupal_internal__tid":2297}]},"drupal_internal__tid":2300}},{"node":{"name":"Phlegraen Fields","weight":4,"relationships":{"field_link_menu":{"fields":{"slug":"/volcanic/volcanoes-italy/phlegraen-fields/"},"drupal_internal__nid":53007},"parent":[{"name":"Volcanoes in Italy","drupal_internal__tid":1677}]},"drupal_internal__tid":1688}},{"node":{"name":"Prediction","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/meteo-hydro/activities/central-functional-centre/prediction/"},"drupal_internal__nid":793535},"parent":[{"name":"Central Functional Centre","drupal_internal__tid":1665}]},"drupal_internal__tid":1666}},{"node":{"name":"Q&A","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/volcanic/volcanoes-italy/phlegraen-fields/bradyseism-phlegraean-fields/qa/"},"drupal_internal__nid":900012590},"parent":[{"name":"Bradyseism in the Phlegraean Fields","drupal_internal__tid":2297}]},"drupal_internal__tid":2365}},{"node":{"name":"RAN- National Accelerometric Network","weight":4,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/activities/emergency-planning-and-damage-scenarios/ran-national-accelerometric-network/"},"drupal_internal__nid":50727},"parent":[{"name":"Emergency planning and damage scenarios","drupal_internal__tid":1641}]},"drupal_internal__tid":1645}},{"node":{"name":"School Building Safety","weight":9,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/activities/emergency-planning-and-damage-scenarios/school-building-safety/"},"drupal_internal__nid":67605},"parent":[{"name":"Emergency planning and damage scenarios","drupal_internal__tid":1641}]},"drupal_internal__tid":1658}},{"node":{"name":"Seismic","weight":83,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic-0/"},"drupal_internal__nid":100838041},"parent":[]},"drupal_internal__tid":1634}},{"node":{"name":"Seismic classification","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/activities/emergency-planning-and-damage-scenarios/seismic-classification/"},"drupal_internal__nid":50717},"parent":[{"name":"Emergency planning and damage scenarios","drupal_internal__tid":1641}]},"drupal_internal__tid":1642}},{"node":{"name":"Seismic Microzonation","weight":6,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/activities/emergency-planning-and-damage-scenarios/seismic-microzonation/"},"drupal_internal__nid":52740},"parent":[{"name":"Emergency planning and damage scenarios","drupal_internal__tid":1641}]},"drupal_internal__tid":1647}},{"node":{"name":"Seismic vulnerability","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/activities/emergency-planning-and-damage-scenarios/seismic-vulnerability/"},"drupal_internal__nid":818402},"parent":[{"name":"Emergency planning and damage scenarios","drupal_internal__tid":1641}]},"drupal_internal__tid":1644}},{"node":{"name":"Stromboli","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/volcanic/volcanoes-italy/stromboli/"},"drupal_internal__nid":70237},"parent":[{"name":"Volcanoes in Italy","drupal_internal__tid":1677}]},"drupal_internal__tid":1678}},{"node":{"name":"Submarine volcanoes","weight":10,"relationships":{"field_link_menu":{"fields":{"slug":"/volcanic/volcanoes-italy/submarine-volcanoes/"},"drupal_internal__nid":71589},"parent":[{"name":"Volcanoes in Italy","drupal_internal__tid":1677}]},"drupal_internal__tid":1697}},{"node":{"name":"Technical committee activities","weight":10,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/activities/emergency-planning-and-damage-scenarios/technical-committee-activities/"},"drupal_internal__nid":900002628},"parent":[{"name":"Emergency planning and damage scenarios","drupal_internal__tid":1641}]},"drupal_internal__tid":1947}},{"node":{"name":"Technical Committee for the support and monitoring of Seismic Microzonation studies (Opcm No. 3907)","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/activities/emergency-planning-and-damage-scenarios/national-plan-seismic-risk-prevention/technical-committee-support-and-monitoring-seismic-microzonation-studies-opcm-no-3907/"},"drupal_internal__nid":67796},"parent":[{"name":"National plan for seismic risk prevention","drupal_internal__tid":1649}]},"drupal_internal__tid":1650}},{"node":{"name":"The current crisis","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/volcanic/volcanoes-italy/phlegraen-fields/bradyseism-phlegraean-fields/current-crisis/"},"drupal_internal__nid":900011436},"parent":[{"name":"Bradyseism in the Phlegraean Fields","drupal_internal__tid":2297}]},"drupal_internal__tid":2299}},{"node":{"name":"The National Emergency Planning for volcanic risk in the Phlegraean Fields","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/volcanic/volcanoes-italy/phlegraen-fields/national-emergency-planning-volcanic-risk-phlegraean-fields/"},"drupal_internal__nid":1145410},"parent":[{"name":"Phlegraen Fields","drupal_internal__tid":1688}]},"drupal_internal__tid":1690}},{"node":{"name":"The phenomenon","weight":5,"relationships":{"field_link_menu":{"fields":{"slug":"/volcanic/volcanoes-italy/phlegraen-fields/bradyseism-phlegraean-fields/phenomenon/"},"drupal_internal__nid":900011434},"parent":[{"name":"Bradyseism in the Phlegraean Fields","drupal_internal__tid":2297}]},"drupal_internal__tid":2298}},{"node":{"name":"The Rapid Emergency Planning for the bradyseism in the Phlegraean Fields","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/volcanic/volcanoes-italy/phlegraen-fields/rapid-emergency-planning-bradyseism-phlegraean-fields/"},"drupal_internal__nid":900011446},"parent":[{"name":"Phlegraen Fields","drupal_internal__tid":1688}]},"drupal_internal__tid":2304}},{"node":{"name":"The response of the National Service","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/volcanic/volcanoes-italy/phlegraen-fields/bradyseism-phlegraean-fields/response-national-service/"},"drupal_internal__nid":900011442},"parent":[{"name":"Bradyseism in the Phlegraean Fields","drupal_internal__tid":2297}]},"drupal_internal__tid":2302}},{"node":{"name":"Timeline","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/volcanic/volcanoes-italy/phlegraen-fields/bradyseism-phlegraean-fields/timeline/"},"drupal_internal__nid":900012588},"parent":[{"name":"Bradyseism in the Phlegraean Fields","drupal_internal__tid":2297}]},"drupal_internal__tid":2363}},{"node":{"name":"Tsunami","weight":86,"relationships":{"field_link_menu":{"fields":{"slug":"/sezione-con-anticipazioni/tsunami-risk/"},"drupal_internal__nid":100837991},"parent":[]},"drupal_internal__tid":1702}},{"node":{"name":"Vesuvio","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/volcanic/volcanoes-italy/vesuvio/"},"drupal_internal__nid":52997},"parent":[{"name":"Volcanoes in Italy","drupal_internal__tid":1677}]},"drupal_internal__tid":1685}},{"node":{"name":"Volcanic","weight":85,"relationships":{"field_link_menu":{"fields":{"slug":"/sezione-con-anticipazioni/volcanic-risk/"},"drupal_internal__nid":100837997},"parent":[]},"drupal_internal__tid":1675}},{"node":{"name":"Volcanic eruption","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/volcanic/volcanic-eruption/"},"drupal_internal__nid":175290},"parent":[{"name":"Volcanic","drupal_internal__tid":1675}]},"drupal_internal__tid":1676}},{"node":{"name":"Volcanoes in Italy","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/volcanic/volcanoes-italy/"},"drupal_internal__nid":176435},"parent":[{"name":"Volcanic","drupal_internal__tid":1675}]},"drupal_internal__tid":1677}},{"node":{"name":"Vulcano","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/volcanic/volcanoes-italy/vulcano/"},"drupal_internal__nid":171319},"parent":[{"name":"Volcanoes in Italy","drupal_internal__tid":1677}]},"drupal_internal__tid":1681}},{"node":{"name":"Year 2010","weight":9,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/activities/emergency-planning-and-damage-scenarios/national-plan-seismic-risk-prevention/year-2010/"},"drupal_internal__nid":174140},"parent":[{"name":"National plan for seismic risk prevention","drupal_internal__tid":1649}]},"drupal_internal__tid":1657}},{"node":{"name":"Year 2011","weight":8,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/activities/emergency-planning-and-damage-scenarios/national-plan-seismic-risk-prevention/year-2011/"},"drupal_internal__nid":174117},"parent":[{"name":"National plan for seismic risk prevention","drupal_internal__tid":1649}]},"drupal_internal__tid":1656}},{"node":{"name":"Year 2012","weight":7,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/activities/emergency-planning-and-damage-scenarios/national-plan-seismic-risk-prevention/year-2012/"},"drupal_internal__nid":173729},"parent":[{"name":"National plan for seismic risk prevention","drupal_internal__tid":1649}]},"drupal_internal__tid":1655}},{"node":{"name":"Year 2013","weight":6,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/activities/emergency-planning-and-damage-scenarios/national-plan-seismic-risk-prevention/year-2013/"},"drupal_internal__nid":173393},"parent":[{"name":"National plan for seismic risk prevention","drupal_internal__tid":1649}]},"drupal_internal__tid":1654}},{"node":{"name":"Year 2014","weight":5,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/activities/emergency-planning-and-damage-scenarios/national-plan-seismic-risk-prevention/year-2014/"},"drupal_internal__nid":173311},"parent":[{"name":"National plan for seismic risk prevention","drupal_internal__tid":1649}]},"drupal_internal__tid":1653}},{"node":{"name":"Year 2015","weight":4,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/activities/emergency-planning-and-damage-scenarios/national-plan-seismic-risk-prevention/year-2015/"},"drupal_internal__nid":670284},"parent":[{"name":"National plan for seismic risk prevention","drupal_internal__tid":1649}]},"drupal_internal__tid":1652}},{"node":{"name":"Year 2016","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/activities/emergency-planning-and-damage-scenarios/national-plan-seismic-risk-prevention/year-2016/"},"drupal_internal__nid":989251},"parent":[{"name":"National plan for seismic risk prevention","drupal_internal__tid":1649}]},"drupal_internal__tid":1651}},{"node":{"name":"Year 2022 - 2023","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/activities/emergency-planning-and-damage-scenarios/national-plan-seismic-risk-prevention/year-2022-2023/"},"drupal_internal__nid":900009956},"parent":[{"name":"National plan for seismic risk prevention","drupal_internal__tid":1649}]},"drupal_internal__tid":2199}},{"node":{"name":"Years 2019 - 2020 - 2021","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/activities/emergency-planning-and-damage-scenarios/national-plan-seismic-risk-prevention/years-2019-2020-2021/"},"drupal_internal__nid":900004376},"parent":[{"name":"National plan for seismic risk prevention","drupal_internal__tid":1649}]},"drupal_internal__tid":1989}}],"menuFooter":[{"node":{"name":"Certified mail PEC","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/approfondimento/certified-e-mail-pec/"},"drupal_internal__nid":300000300}},"drupal_internal__tid":1890}},{"node":{"name":"Contacts","weight":6,"relationships":{"field_link_menu":{"fields":{"slug":"/approfondimento/contacts/"},"drupal_internal__nid":300001713}},"drupal_internal__tid":1893}},{"node":{"name":"Glossary","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/elenco-glossario--versione-inglese-/"},"drupal_internal__nid":1664}},"drupal_internal__tid":1887}},{"node":{"name":"Legal notes","weight":5,"relationships":{"field_link_menu":{"fields":{"slug":"/approfondimento/note-legali/"},"drupal_internal__nid":300001711}},"drupal_internal__tid":1892}},{"node":{"name":"Modules","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/department/forms/"},"drupal_internal__nid":300001717}},"drupal_internal__tid":1889}},{"node":{"name":"Online services","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/approfondimento/online-services/"},"drupal_internal__nid":300001701}},"drupal_internal__tid":1888}},{"node":{"name":"Privacy","weight":4,"relationships":{"field_link_menu":{"fields":{"slug":"/approfondimento/privacy-0/"},"drupal_internal__nid":300001705}},"drupal_internal__tid":1891}}],"socialImg":null}},"staticQueryHashes":[]}